Laserfiche WebLink
<br />YELLOW JACKET PROJECT <br />GEOTECHNICAL INVESTIGATION <br /> <br />Ave~y Dam Enlargement <br /> <br />Drilling gOO lf @ $30/lf <br /> <br />Backhoe 40 hrs @ $50/hr <br /> <br />Auger 400 If @ $ 5/lf <br /> <br />Seismic Refraction (left abutment) <br /> <br />Materials Testing (class., grad., perm., <br />triax., in situ) <br /> <br />Surveying (topography and control) <br /> <br />Engineering (field inspection, geologic mapping, <br />report preparation) <br /> <br />+ 20% Contingencies <br /> <br />Total <br /> <br />Warner Point Dam <br /> <br />Drilling 1200lf @ $30/lf <br />Backhoe 40 hrs @ $50/hr <br />Se i smi c Refract i on (1 eft abut. & channel) <br />Materials Testing (class., grad.) <br />Surveying (topography & Control) <br />Engineering (field inspection, geologic mapping, <br />report preparation) <br /> <br />+ 20% Contingencies <br /> <br />Total <br /> <br />4 <br /> <br />$27,000 <br /> <br />2,000 <br />2,000 <br />15,000 <br />12,000 <br /> <br />5,000 <br />20,000 <br /> <br />83,000 <br />16,600 <br /> <br />$99,600 <br /> <br />$36,000 <br />2,000 <br />10,000 <br />5,000 <br />5,000 <br />20,000 <br /> <br />78,000 <br />15,600 <br /> <br />$93,500 <br />