My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 01/06/1983
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
Board Meeting 01/06/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:14:07 PM
Creation date
10/4/2006 7:13:12 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/6/1983
Description
CWCB Meeting - No mins.
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Una <br />Draft <br />1/4/83 <br /> <br />Mr. Ted L. Stricklann <br />President of the Senate <br />Colorado General Assembly <br />State Capitol <br />Denver, CO 80203 <br /> <br />Mr. Carl B. Bledsoe <br />Speaker of the House of Representatives <br />Colorado General Assembly <br />State Capitol <br />Denver, CO 80203 <br /> <br />Gentlemen: <br /> <br />Section 7 of S.B. 439, 1981 Session (Chapter 426, Session <br /> <br />Laws of Colorado 1981) directed the Colorado Water Conservation <br /> <br />Board to study the Una Reservoir pro~~be located <br /> <br /> <br />on the Colorado River between DeBeque and parachute.^ Whe Board <br /> <br /> <br />contracted with R.W. Beck and Associates to perform the study, <br /> <br />the executive summary for which is enclosed herewith. The full <br /> <br />report is being printed and will be forwarded to you <br /> <br />subsequently. <br /> <br />The study demonstrates that the Una Dam and Reservoir, <br />including a 32 MW run-of-the-river power plant, would be <br /> <br />~ <br /> <br />technically feasible, <br /> <br />The 189,000 acre-foot reservoir (active <br /> <br />capacity) would have an annual yield of 175,000 acre-feet which <br />would decline to 126,000 acre-feet over time as sediment reduced <br /> <br />the reservoir's storage capacity. The cost of constructing the <br /> <br />project is estimated at $181,588,000 in constant, 1982 dollars. <br /> <br />If inflation is taken into account over an assumed 8-9 year <br /> <br />design and construction schedule, the construction cost would be <br /> <br />$284,388,000. Financing costs would be in addition to this and <br /> <br />would vary as a function of the financing method employed. <br /> <br />190 . <br />una/d <br />
The URL can be used to link to this page
Your browser does not support the video tag.