My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02265
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:14:02 PM
Creation date
10/4/2006 7:13:08 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/25/1996
Description
Summary Minutes and Record of Decisions - November 25-26, 1996
Board Meetings - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Action: There was one correction to the September 1996 minutes: there was a misspelling of <br />the word amortization in item 15. A motion was made by David Smith to <br />approve the minutes with this change. The motion was seconded by Ray <br />Werner and approved unanimously (9-0). <br /> <br />3. Directors' Reports - CWCB, DOW, SEO, AG, EDO, CWR&PDA <br /> <br />Tape 1, Start/Stop: 0313 - 1950 <br />Action: Reports from CWCB, SEO, AGO, DOW and CWR&PDA were heard at this <br />time. This was an informational item; no action taken. <br /> <br />4a-d. Water Project Construction Loan Program - Project Deauthorizations <br />Tape 1, Start/Stop: 1950 - 2060 <br />Action: All six items were taken together. A motion was made by Janice Sheftel to <br />accept the staff recommendation that the appropriated amounts for the six <br />specific projects identified be recommended to the General Assembly for <br />deauthorization in the annual Construction Fund bill. The motion was <br />seconded by Ray Werner and approved unanimously (9-0). <br /> <br />5. Water Project Construction Loan Program - Interest Rate Recommendation for 1997 <br />Tape 1, Start/Stop: 2060 - 2349 <br />Action: A motion was made by Ray Werner to accept the staff recommendation that <br />the Board adopt a standard lending rate of 4.75 percent and the schedule of <br />30-year lending rates as shown in the staff memo for all loans recommended <br />to the General Assembly or approved by the Board in 1997, and that the 30- <br />year lending rate be reduced for each category of loans by one-quarter of one <br />percent for all loans with maturities of 20 years or less but more than 10 <br />years and by one-half of one percent for all loans with maturities of 10 years <br />or less. The motion was seconded by Patricia Wells and approved <br />unanimously (9-0). <br /> <br />6. Water Project Construction Loan Program - Proposed Criteria for Use of Severance <br />Tax Trust Fund <br />Tape 1, Start/Stop: 2349 - 3170 <br />Action: A motion was made by David Harrison to accept the staff recommendation <br />that the Perpetual Base Account general policies be essentially the same as <br />the Construction Fund in respect to loans, except that if there were a shortage <br />of available cash there would be a general preference accorded to energy <br />impacted communities to the extent of these monies. With respect to the <br />operational account and the grants, the Board shall follow the staff <br />recommendation to the 50 percent cost share that would not include any <br />upper monetary limit, and again, in the event of shortfall of any available <br />grant money or feasibility money, that there be a preference accorded to <br />impacted communities. The motion was seconded by Alan Hamel and <br />approved (9-1). <br /> <br />Minutes November 25-26, 1996 CWCB Meeting <br />
The URL can be used to link to this page
Your browser does not support the video tag.