Laserfiche WebLink
<br />Issues Remaining <br />Some of the issues, which still need to be addressed are: <br /> <br />. the design concept which will result from discussions between CDOW and the design <br />engineer in the next few weeks, <br /> <br />. whether $2,8 million will be adequate for the design and construction of the proposed <br />facility, and <br /> <br />. whether more funds could, if needed, be made available for the project in the near <br />future and where those funds could be obtained. <br /> <br />Obviously, more information is necessary before the feasibility study can be satisfactorily <br />completed. We expect that information to be available to us in late Mayor early June. <br /> <br />If you have any comments or questions we would be happy to discuss them with you. No <br />action is recommended at this time. <br /> <br />Cc: Eric Hughes, CDOW <br />Linda Bassi, AGO <br /> <br />2 <br /> <br />~ <br /> <br />.' <br /> <br />. <br />