Laserfiche WebLink
<br />As another part of our plan of implement a- <br />tion we set up surveillance stations. We <br />originally started with 77 on the streams in <br />Colorado. We aave now increased them to 88. <br />We are now in the planning stages of increas- <br />ing that to 128 stations. These we try to 1 <br />sample on a once-a-month basis. But due to <br />lack of manpower and other commitments, we <br />don't alway" qet around to them ev",y month. . <br />We are in hopes that maybe this year we will <br />be able to do it on a once-a-month basis. <br /> <br />Originally we sampled for some 26 para- <br />meters or analyzed for 26 parameters. We <br />since then have moved this down. Let us say, <br />if we found that a certain station had no <br />selenium after six months, we didn't continue <br />testing for selenium or mercuries, etc. We <br />check it. however, on a six months basis. <br /> <br />Another thing that we have done is pur- <br />chase a trailer laboratory. A mobile home <br />type trailer was made into a field laboratory. <br />We have a Chevrolet carryall truck to pull it <br />around. It has three purposes. One, where <br />we find a particular station that is out of <br />bounds, we attach the trailer to this location <br />to find out why the particular station was out <br />of bounds. In other words, they start checking <br />at this particular station and work upstream <br />from there. We have been using it lately on <br />stream studies. You probably have read of <br />the study on the Cache la poudre. We are <br />presently working on a followup study on <br />Clear Creek. We also use it for training <br />purposes. <br /> <br />We find that in many cases when we go <br />into a community, set up the laboratory at <br />their sewage treatment plant, invite the city I. <br />officials in and show them that with better <br />laboratory control they can get better control <br />of the treatment facilities. In many cases it <br />has helped convince the city officials that <br />they should get a laboratory for their plant <br />