Laserfiche WebLink
<br />Agenda ['em 16a <br />January 27-28, 1999 Board Meeting <br />Page 2 of2 <br /> <br />South Platte and DSS positions should be able to handle the workload. If an <br />accelerated schedule is desired additional FTE's are necessary. <br /> <br />. <br /> <br />Recommendation <br /> <br />Staff recommends that the Board include a recommendation in the 1999 <br />Construction Fund and Severance Tax Bill to appropriate $100,000 for the <br />conduct of a South Platte River Decision Support System scoping study. <br />Furthermore, staff recommends that Board work with local water users and others <br />interested in the South Platte River Basin to establish a Technical Advisory <br />Committee to consult with on the development of the Scope of Work for the <br />conduct of a South Platte DSS Scoping study. Finally, staff believes that <br />development of the Scope of Work for the Scoping study and the consultant <br />selection process can be completed by December 31, 1999 and the Scoping study <br />completed by December 31, 2001. <br /> <br />. <br /> <br />.. <br /> <br />. <br />