My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02200
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02200
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:13:24 PM
Creation date
10/4/2006 7:12:25 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/26/2001
Description
CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. I.i <br /> <br />I <br /> <br />This project is being conducted by the Purgatoire Riv~r Water Conservancy District [PRWCD] . <br />in conjunction with the USGS and USBR In Phase !:it was determined that on an annual <br />average basis mainstem losses were offset by gains. :in Phase II the remaining $35,000 of <br />CWCB funding is paying for a portion of the costs of;an analysis of transit losses in the <br />conveyance systems ofthe participating members of the PRWCD. This information will enable <br />the PRWCD to better allocate its water supply, and wiill also help answer questions about water <br />use and return flows raised by downstream water usets. The CWCB's Phase II funds have not <br />yet been contracted. as the work loads between the PRWCD, USGS, and USBR are still being <br />refined. <br /> <br />Southeastern Colorado Water Conservancv District - Water and Storage Needs Assessment <br />Authorization: HB Grant Amount: $25,000 <br />Water Source: Purgatoire River Ji'roject Type: Water Supply Study <br />Location: Pueblo i'roject Manager: Steve Miller <br />i <br /> <br />This project is being conducted by an enterprise c~eated by the Southeastern Colorado Waier <br />Conservancy District [SECWCD] in conjunction witlj. municipal and agricultural water users with <br />its service area. Phases I and U received $IOO,OO() of CWCB grants from the severance tax <br />account [see beiow] which paid for a portion of an:analysis of future water supply and storage <br />needs in the iower Arkansas basin [Buena Vista to Lamar]. Phases I and II resulted in a <br />quantification of needed storage space and a Prefefted Storage Options Plan for meeting these <br />needs. This additional $25,000 grant from the cdnstruction fund is being used to allow the <br />, . <br />SECWCD to examine in more detail issues surrounding agricultural to urban water rights <br />transfers and a District water bank or management account at Pueblo Reservoir as part of Phase <br />II. Contracts beti.veen the District and and CWCB I for this additional work are currently being <br />developed. <br /> <br />Lower Elk River Flood Associaiion Elk River Streainbank Study <br />Authorization: HB 98-1189 HB 00-1419 ;Grant Amount: $30,000 + $15,000 <br />Water Source: Elk River !Project Type: Stream Stblzation Study <br />Location: 8 mi. west of Steamboat Spgs. !Project Manager: Larry Lang <br /> <br />eWCB contracted with Icon Engineering, Inc. to perform an engineering investigation for Elk <br />River watershed study and streambank stabilization project on the lower one mile of the river. The <br />study is now complete and developed the hydrologic: and hydraulic characteristics of the waiershed <br />and provided engineering recommendations for the stabilization of the Elk River streambank <br />upstream of Highway 40. Following the Icon studY" some iandowners along the river contracted <br />with an independent consultant and privately funde<l river restoration work. CWCB staff has no <br />further funding requests or projects on the lower Elk jQver at this time. <br /> <br />Town ofPaonia Waier SU\lplv Feasibilitv Study <br />Authorization: SB 99-173 <br />Water Source: <br />Location: Paonia <br /> <br />Grant Amount: $10,000 <br />, Project Type: Feasibility Study <br />Proj ect Manager: Bill Green <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.