My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02200
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02200
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:13:24 PM
Creation date
10/4/2006 7:12:25 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/26/2001
Description
CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />58 <br /> <br />. <br /> <br />TIlE PLUMB AND DAILEY DITCH COMPANY <br />BOULDER CREEK DIVERSION STRUCTURE REHABILITATION PROJECT <br /> <br /> <br />- <br /> <br />... <br />~ <br /> <br />, <br />I <br /> <br />\, <br /> <br />L .. . <br />r'..}3~.~;f~~'... <br /> <br />~ <br /> <br />c '_ <br />~. <br />~ <br /> <br />'" <br /> <br />- <br /> <br />.' <br />y' <br /> <br />- <br />.~... <br />..- <br /> <br />~ <br /> <br />. <br /> <br />- ~",,~ <br />Looking North Across thc Ncw Diversion Structure on Boulder Creek <br /> <br />.- <br /> <br />Proiect Description <br /> <br />This project is the rehabilitation of the Plumb and Dailey Ditch Company', diversion <br />structure on Boulder Creek. which had deteriorated due to age to the point of replacement. The <br />replacement structure, designed by Natural Resources Conservation Service. Greeley Office. <br />consists of a new 4X-Ii. long concrete diversion wall. with X - C'-xl'raised gates, and a 25-ft. long <br />dO\\illstrcam grollted rip rap spill basin. Concrete Structures. out of Longmonl. Colorado, <br />constructed the project at a total cost = S45.000. <br /> <br />Project Data <br /> <br />Sponsor: Plumb and Dailey Ditch CO. Counly: l30ulder Water Source: Boulder Creek <br /> <br />Terms of' Loan: S37.6X9 @ 3.75% for 20-years <br /> <br />Substantial Completion Date: April l. 200 I <br /> <br />Design EngirH'er: Natural Resources Conservation Service (NRCS) - Greeley. Colorado <br /> <br />Construction Contmctor: Concrete Structures, Inc. - Longrnont. Colo.rado. <br /> <br />Design Criteria: <br /> <br />Diversion Length = 4X-fl. X raised gates - 6-ft Io.ng by 2-ft. high <br />Rip rap spill basin = 25-1i Io.ng by width o.f channel <br /> <br />Annual Volnme of' Water Delivered by the Pro.ieet: 2.27X acre-ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.