My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02191
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02191
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:13:17 PM
Creation date
10/4/2006 7:12:20 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/18/1964
Description
Agenda or Table of Contents, Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />on tunnel work next spring will include the <br />Fryingpan-Arkansas Tunnel, 5-3/10's miles long; <br />will include the tunnel from the Fryingpan to <br />the South Fork; and include the tunnel from the <br />South Fork to Chapman Gulch; making a total <br />length of about 12 miles of tunnel work that <br />we expect to issue the specifications on in <br />March next year, 1965, and get an award in <br />Hay, 1965. <br /> <br />I <br /> <br />Turquoise Lake, on the east slope, the <br />first reservoir here (pointing) will follow <br />shortly thereafter. vIe expect to issue that <br />specification in July, 1965, with an award in <br />September, 1965. <br /> <br />We will be continuing studies on Twin L~(es <br />and on the east slope power system to determine <br />the final design for this large reservoir and <br />for this power system. That will follow in <br />subsequent years. <br /> <br />A significant item of work involved is at <br />Pueblo Reservoir where we have the main line of <br />the Denver and Rio Grande Western Railroad to <br />be relocated. Our studies are under way there <br />now. We have surveyors actively surveying re- <br />locating the alignment and grade of that road <br />and we will be doing drilling and testing yet <br />this summer on that particular work. t'/'e hope to <br />have a contract awarded for the relocation of <br />that railroad in July, 1966, and, of course, the <br />railroad has to be out of the way before we <br />build the reservoir so the darn contract will be <br />awarded in the spring of 1968. It will take us <br />about two years of time to get that railroad <br />sufficiently relocated so that the darn contractor <br />can get in there and work. <br /> <br />Our first diversions under this program, <br />of waters from the west slope will be made in <br />1969. That will not be complete diversions but <br />it will include diversions from the first <br />features that we get under construction and will <br />involve such diversions as may be made from the <br />South Fork, from the Chapman Gulch, and possibly <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.