Laserfiche WebLink
<br />We have received comments from the State <br />of Utah on our reconnaissance report on the <br />Juniper Project. <br /> <br />I think there was no change from what was <br />reported to you at your last Board meeting as <br />far as the Animas-La Plata Project is concerned. <br />The report was approved by the Secretary on <br />April 10th and transmitted to the President. <br /> <br />I <br /> <br />On the Dolores Project the feasibility <br />report has been sent to all state and federal <br />agencies under the Flood Control Act. <br /> <br />On the San Miguel project our work is <br />rapidly drawing to a close. We have, I think, <br />practically all of the designs and estimates <br />on that project. There still remains certain <br />feasibility studies to be made and these are <br />scheduled for completion late this fall. <br /> <br />On the West Divide Project we have most all <br />of our designs and estimates, final designs, <br />under way at the present time. We intend to <br />complete that report. at least the field draft, <br />by the middle of this present fiscal year. <br /> <br />On our Dallas Divide Project we have just <br />received practically all of our designs and <br />estimates, our final estimates. He have re- <br />ceived all of the cooperating agencies reports <br />except one so we are now in a position to com- <br />plete our field draft on that report. <br /> <br />He are practically on schedule as far as <br />Battlement Mesa, Bluestone, Grand Mesa and <br />Yellow Jacket Projects are concerned. <br /> <br />The other item of activities is our small <br />reclamation project at Orchard City with the <br />Orchard City Irrigation District. They did <br />open bids on part of the work on this project <br />on last Wednesday. The bids were very close to <br />the Engineer's estimate and on the remaining <br />work on this project bids are scheduled for <br />opening next Monday. <br /> <br />I <br />