My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02191
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02191
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:13:17 PM
Creation date
10/4/2006 7:12:20 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/18/1964
Description
Agenda or Table of Contents, Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Members of the Board, ladies and gentlemen, <br />and guests, I'll try to make this as short as <br />I can. I know that you have a busy schedule. <br />First on our Storage Units, the main contractor <br />on the Glen Canyon Dam is about 99 percent <br />finished. We are working seven days a week <br />around-the-clock to get the generators ready <br />in anticipation of testing which will start <br />about the 19th of August and in going into com- <br />mercial generation in september. <br /> <br />I <br /> <br />At Curecanti, the work at Blue Mesa Dam <br />is better than 60 percent completed. Founda- <br />tion excavation has been completed. A small <br />amount of earthfill has been placed in the dam. <br />The contractor is presently finishing his strip- <br />ping operations on the abutments, working in the <br />powerplant foundation, and so on. We hope that <br />he will finish about two-thirds to three-quar- <br />ters of the earthfill in that dam this construc- <br />tion season. <br /> <br />At Morrow point, the Gunnison River was <br />diverted on May 11th. The access road to the <br />top of the dam is substantially completed. The <br />contractor now is stripping his abutments, doing <br />his foundation excavation, and also working on <br />the excavation for the underground powerplant. <br /> <br />At the Florida Project the Lemon Dam is <br />completed. The first water was released in May <br />for that project and the work remaining is prin- <br />cipally work on a few of the laterals for this <br />project. <br /> <br />I think, if you have been following the <br />worJ, in the papers, that you know that we <br />opened bids on Rifle Gap Dam on the 23rd of <br />June. The apparent low bidder on the dam has <br />alleged an error on his bid. His material has <br />been collected from the contractor. He did <br />submit a claim and it is presently under review <br />in \'1ashington. <br /> <br />I <br /> <br />It' 5 rather unique that we would have two <br />of those same situations within one week's <br />
The URL can be used to link to this page
Your browser does not support the video tag.