My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02167
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02167
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:13:02 PM
Creation date
10/4/2006 7:12:04 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/14/1962
Description
Minutes and Resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Flaming Gorge is moving toward the windup <br />this year. We still expect it will be topped <br />out about the 1st of November. By September <br />1st we had about 890,000 yards out of the <br />1,000,000 total in the structure. I was there <br />last week and it's always gratifying, maybe <br />give a sigh of relief, to see those blocks <br />clear up to the top to where the highline <br />bucket was just barely clearing the top form. <br />On the two highest blocks they only had two <br />pours left to finish out roadway level. <br /> <br />I <br /> <br />Good progress has been made on Blue Mesa <br />Dam this summer. The diversion tunnel was <br />holed through week before last and the con- <br />tractor is getting squared away now to make <br />good progress the rest of this working season. <br />The tunnel lining will go on this winter. <br /> <br />The State Highway contractors are also <br />making good progress on the highway relocation. <br />They have two sections of the highway under <br />construction now and the third will be started <br />this coming spring. There was a little set- <br />back here a week or two ago on the Lake Fork <br />bridge when the contractor dropped one of <br />those large beams into the Lake Fork River, a <br />few hundred feet below. The report I got yes- <br />terday was that that beam can be repaired and <br />it will not delay the work on that bridge for <br />which I am gratified. We were worried about <br />both those bridges; whether they would get <br />done in time to permit the diversion of the <br />river. <br /> <br />You all know that Navajo Dam was topped <br />out in August and we're going to have the dedi- <br />cation ceremony tomorrow. I hope that all the <br />people that are here for this meeting will be <br />able to make that dedication ceremony. The <br />Secretary will be the principle speaker. It, <br />of course, is' the first of our storage Units <br />to be completed. <br /> <br />I <br /> <br />This same month of September we are going <br />to have another first in that we'll have the <br />
The URL can be used to link to this page
Your browser does not support the video tag.