Laserfiche WebLink
<br />" <br /> <br />. <br /> <br />INTENT <br /> <br />Injury with Mitigation Pretrial Resolution <br /> <br />. Described as accepting less than full protection of an ISF right, <br />but without permanent flow reduction or segmentation of the ISF <br />right involved <br /> <br />. Board only will accept if: <br /> <br />The proponent establishes that no other reasonable alternative <br />exists to provide full protection of the ISF right <br /> <br />Mitigation is proposed that will allow the depletion to take place <br />while continuing to preseNe or improve the natural environment <br />to a reasonable degree <br /> <br />.! <br /> <br />INTENT <br /> <br />Injury with Mitigation Pretrial Resolution <br /> <br />. Board may consider economic and environmental consequences <br />of alternatives when evaluating reasonableness of alternatives <br /> <br />. Board only will consider mitigation in an area other than the <br />affected stream reach if no alternatives exist for mitigation on the <br />affected stream reach <br /> <br />. <br /> <br />2 <br />