Laserfiche WebLink
<br />. <br />. <br /> <br />- <br /> <br />. <br /> <br />5. Perform a field reconnaissance of each site to include existing facilities <br /> <br />6. Identify potential operational relationships between plan elements including <br />existing facilities <br /> <br />7. Perform a preliminary analysis of plan elements to include ability to meet the <br />study objective and potential implementation problems <br /> <br />8. Perform a preliminary screening to eliminate less favorable plan elements <br /> <br />Task 4 - Reconnaissance-Level Analvsis of Preliminary Alternatives <br /> <br />1. Evaluate capacities and operational characteristics of each potential reservoir and <br />recharge site and conveyance facility <br /> <br />2. Evaluate possible combinations of plan elements to include existing and potential <br />facilities <br /> <br />3. For each alternative: <br /> <br />Conduct operations studies to estimate project yields <br /> <br />Conduct geotechnical investigations (optional) <br /> <br />Identify land ownership and right-of way considerations <br /> <br />Prepare reconnaissance-level cost estimates <br /> <br />Prepare a preliminary evaluation of monetary and no'n-monetary costs and <br />benefits <br /> <br />Task 5 - Selection and Evaluation of Preferred Alternative(s) <br /> <br />I. Develop an alternatives screening procedure <br /> <br />2. Present the reconnaissance-level alternatives to the study advisory committee <br /> <br />3. Assist in the selection of preferred alternative(s) <br /> <br />4. Refine preliminary design, yields and cost estimates for the preferred <br />a1ternative(s) including operation and maintenance costs <br /> <br />5. Prepare preliminary implementation schedule(s) for the preferred alternative(s) <br /> <br />2 <br />