My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02132
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02132
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:12:39 PM
Creation date
10/4/2006 7:11:29 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/30/1991
Description
Agenda or Table of Contents, Minutes, Memos. Not All Materials Are Included.
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />. <br /> <br />10. Maintenance of stream Channel. upon the commencement <br />of storage of the Lakewood Water in Bear Creek Lake pursuant <br />to Paragraphs 2 and 3 of this Agreement, and to the extent of <br />Lakewood's rights under its lease of Bear Creek Lake Park from <br />the Corps, Lakewood agrees to maintain .the stream channel of <br />Bear Creek from immediately below Bear Creek Dam to the point <br />at which the channel exits the eastern boundary of Bear Creek <br />Lake Park, which point more specifically bears S 75. W a <br />distance of 500 feet, more or less, from the center corner of <br />Section 33, T. 4 S., R. 69 W. of the 6th P.M. The following <br />will be considered as minimum action required by Lakewood to <br />maintain this segment of the stream channel: <br /> <br />. <br /> <br />a. <br /> <br />Prevent wasting or dumping of materials in the <br /> <br />channel; <br /> <br />b. Ensure that accumulations of debris around <br />structures in the channel such as bridges and weirs will be <br />removed promptly following a flood; and <br /> <br />c. Control all alterations of and encroachments <br />upon the "revised floodplain" as delineated in the two-page <br />floodplain analysis performed by Muller Engineering and set <br />forth in its letter of December 7, 1990, attached hereto as <br />Exhibit A, except for necessary construction in the floodway <br /> <br />. <br /> <br />-7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.