My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02111
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:12:12 PM
Creation date
10/4/2006 7:10:56 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/16/2006
Description
CWCB - Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />~ <br /> <br />Flow Subscription Mailing List, the March CWCB agenda and meeting, Staff provided public notice that <br />these streams are being considered for appropriation. To view these reports, please go to the CWCB <br />website at: http://cwcb.state.co.uslisfIWork_PIan/2007_Recommendations.htm. <br /> <br />ICON Engineering Selected to Perform Flood Documentation Services: The CWCB has chosen <br />ICON Engineering to provide flood documentation for the FY06/07 flood season. ICON will be asked to <br />respond to flood events in order to gather infonnation regarding the extent and intensity of the flood <br />event. At the end of the flood season, all event reports will be combined into a single flood season report. <br /> <br />Floodplain Map Modernization Update: <br /> <br />. FY 06 Counties: The CWCB has received preliminary cost estimates from PBS&J and Anderson <br />Consulting Engineers for the FY06 counties to be studied and remapped: Weld, Teller and <br />LaPlata. We submitted Mapping Activity Statements for all of these counties at the end of April <br />to FEMA. These projects are to begin in September which is the beginning of the Federal fiscal <br />year. Scopes of Work for the 2006 countywide mapping studies are being developed by Staffand <br />the consultants. Pre-scoping notification letters are scheduled to be sent to Swnmit, Lake and <br />Park Counties during the summer of 2006 to prepare for activities during the next fiscal year. <br /> <br />. FY OS Counties: Garfield County is waiting on a signed task order and it is anticipated that this <br />can be obtained in the near future in order to initiate field survey work. Mesa, Fremont, and <br />Clear Creek Counties are on hold until field surveys for the detailed study areas can be <br />completed, but all three studies are still on schedule. Montezuma County is on schedule and is in <br />the midst of the hydraulic modeling phase of the project. <br /> <br />. FY 04/03 Counties: Larimer County ended its 90-day appeal period at the beginning of May, <br />however an appeal was made by a landowner in the Fort Collins area regarding technical <br />infonnation on Boxelder Creek. FEMA granted a 10 day extension of the appeal period to assess <br />the concern. The final floodplain maps for the county are scheduled to be effective in December <br />2006. Boulder and Adams Counties (within the Urban Drainage and Flood Control District) are <br />scheduled to obtain effective maps by September 2006, and Arapahoe County (also within the <br />Urban Drainage District) should have effective maps in November 2006. Fremont County should <br />have revised preliminary panels in the near future, and Clear Creek County is in the midst of their <br />scheduled appeal period with no known problems at this time. <br /> <br />The CWCB and FEMA are working with the City of Pueblo and the Pueblo Conservancy District <br />to recertify the levees. CWCB is providing coordination services and plans to initiate a monthly <br />progress meeting for all entities to establish good communication and help keep the project <br />moving forward. Staff has also offered to provide some possible funding from the Map <br />Modernization fund to assist in the recertification effort. FEMA has offered to provide some <br />funding for additional detailed studies to identify sections of each levee that actually provide 100- <br />year protection; recertification is only needed where the 100-year floodplain is being retained. In <br />addition, FEMA and their consultant are planning to create guidelines that the City of Pueblo and <br />the Pueblo Conservancy District can use to obtain a cost estimate for recertification. As a result <br />of this meeting, the team was able to detennine a plan of action and initial steps to achieve the <br />desired goal. <br /> <br />. Certification of Pueblo Levees: The schedule for the Pueblo County Digital Flood Insurance <br />Rate Map (DFIRM) project has been extended for one year due to new guidelines resulting from <br />impacts of Hurricane Katrina on the New Orleans levee systems. Four levees are located within <br /> <br />33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.