My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02109
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:12:09 PM
Creation date
10/4/2006 7:10:47 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
6/15/1950
Description
Table of Contents, Minutes and Resolutions. Volumes I and II of Transcription of Meeting
Board Meetings - Doc Type
Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />400 <br /> <br />quantities equal to those recommended as a minimum at the head of the <br />Aspen Reservoir according to the following schedule submitted by the <br />United Btates Fish and Wildlife Service and the Colorado Game and Fish <br />Commission: <br /> <br />Month Average Second Feet Acre-Feet (1,000) I <br />Oct. 44 2.7 <br />Nov. 35 2.1 <br />Dec. 29 1.8 <br />Jan. 26 1'.6 <br />Feb. 25 1.4 <br />Mar. 24 1.5 <br />Apr. 64 3.8 <br />May 100 6.2 <br />June 120 7.1 <br />July 100 6.2 <br />Aug. 63 3.9 <br />Sept. 44 2.6 <br />Total 40.9 <br /> <br />In maintaining the above averages, at no time shall the Dow be <br />reduced below 15 c.f.s. during the months of August to April, inclusive, <br />or below 60 c.f.s. during the months of May to July, inclusive, providing <br />the natural flow during said period is not less than these amounts. The <br />obligation to supply the minimum stream flow as set forth in the above <br />table on the Roaring Fork River to the extent of 3,000 acre feet _annually <br />shall be a project obligation to be supplied from any waters diverted <br />from the south tributaries of Hunter Creek, Lime Creek, Last Chance Creek, <br />or any of them. <br /> <br />The Twin Lakes Reservoir and Canal Company shall not be required <br />to refrain from diverting water under its existing decrees from the <br />Roaring Fork River except to the extent that a like quantity of re- <br />placement water is furnished to said company without charger therefor <br />through and by means of project diversions. . - . - <br /> <br />If by reason of storage capacity reserved in the Aspen Reservoir <br />for replacement purposes as the term is used in paragraph 6 of these <br />Operating PrinCiples, the- Twin Lakes Reservoir and Canal Company derives <br />additional water or other benefits or advantages it would not have <br />realized had this project not been constructed, then nothing herein <br />contained shall prevent the project from making appropriate charg'es for <br />such water or other benefits or advantages. <br /> <br />I <br /> <br />11. All lands acquired for project construction and operation <br />and water surfaces of project reservoirs will be open to the public for <br />recreational purposes, excepting those areas restricted by the operating <br />agency for reason of operation and safety. <br />
The URL can be used to link to this page
Your browser does not support the video tag.