Laserfiche WebLink
<br />'16 <br /> <br />taken oft that work due to the tunnel emergency, and we liave <br />been unable to finish that report; but it is anticipated that <br />with1n the next month or two we can finish up the report on <br />the Smith Fork. <br />MR. HUGHES: Where 1s the Smith Fork' <br />MR. JEX: UP. near Crawford, Jl1dge. It's a project Which <br />would serve supplemental ir1"1gation to the lands under the <br />. Smith Fork Creek. <br />NIIlW, we are also work1ng on the project in the area <br />around Oedaredge. We just started that work. It 1sn't anUc;.. <br />lpated at thls time that it "111 be a long job. We are en- <br />deavoring on that to. run that just a8 fast a8 we can. <br />MR. HUGHES: Let ms interrupt: Does that include the <br />oOnsolidation ot all the water supply in that area' <br />MR. JEl: I would say 1ngeneral it 1nvolves the Fruit <br />Growers' Reserv01r, which would open up the possibility of <br />oonsolidation if those people ohoose to do that. <br />HR. HUGHES: You were present. at the meeting when Judge <br />Stone was present some tour or f1ve years ago, which was pro.. <br />posed, draw1ng a plan for the consolidat10n of the vater r1ghts <br />in the area there' <br />MR. JEX: Yes. <br />MR. HUGHES: That 18 to be 1noluded 1n this' <br />MR. JEl: . That's right. It ViII open up an avenue 1n <br />which they ean conso11date those rights; and certainly, the <br />