My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02109
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:12:09 PM
Creation date
10/4/2006 7:10:47 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
6/15/1950
Description
Table of Contents, Minutes and Resolutions. Volumes I and II of Transcription of Meeting
Board Meetings - Doc Type
Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />75 <br /> <br />referred to the personnel of thls Board for study. <br />MR. STONE: Hr. Jex, may I ask a question' <br />MR. JElt: Yes. <br />HR. STONE: Am I correct ln an lnqulry whlch I made of <br />y()u.recently that the report w11l probably not be ln form for <br />d180usslon with looal lnterests and th1s Board before somet1me <br />ln Ootober? <br />MR. JEl: I don't see how 1t oan, Judge. We want to <br />finish wr1tlng lt up first, wh1ch we are making every e1':tort <br />to do by July. Knowing the route that other reports hil.vetaken, <br />lt wouldn't be ant101pated that 1t would be ava1lable pr10r to, <br />oh, maybe sOlllet1me 1n Ootober; maybe September or October. <br />Now, beginning last late summer, we undertook a s1mllar <br />study on the Colorado River above Grand Junot10n. We now have <br />on that work' qu1te a large statt. We got 1n a small amount of <br />work 1n the tall months. We had to discont1nue some of that <br />work dur1ng the winter because of a large part of 1t be1ng 1n <br />high alt1tudes, and the force1s now baok on the job again. <br />I . think at the present t1me there 18 1n the ne1ghborhood - of, <br />oh, some 30 men engaged ln that work. We are malt1ng every <br />effort posslble to accelerate that study and work that up <br />Just as fast as 110 1s humanly poss1ble to do 1t. <br />Now, as to the other 1nvest1gat1ons 1n Grand Junotion, <br />we had hoped to finlsh up 8. report on the Sm1th-Fork projeot <br />and have that f1n1shed by July. Some ot our personnel was <br />
The URL can be used to link to this page
Your browser does not support the video tag.