Laserfiche WebLink
<br />Sou1h Side Reservoir Company <br />January 22-23. 2003 <br /> <br />Agenda Item 19& <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />. <br /> <br />Borrower: South Side Reservoir Company <br /> <br />County: Larimer <br /> <br />Project Name: South Side Reservoir <br /> <br />Project Type: Rehabilitation <br /> <br />Drainage Basin: <br /> <br />South Platte River <br /> <br />Water Source: Big Thompson River <br /> <br />,Total Project Cost: $400,000 <br /> <br />Funding Sources: CWCS and CompanY <br /> <br />Type of Borrower: AgrlculluraVMunlcipal <br /> <br />Median Household Income: Average <br /> <br />CWCB Loan: $380,000 <br /> <br />Blended Interest Rate: 3.1% Tenn: 30years <br /> <br />CWCB Grant: $5,000 <br /> <br />Total annual storage (fill and refill): 1,241 acre-feet <br /> <br />~he South Side Reservoir Company operates the South Side Reservoir for delivery of irrigatic <br />water within a 4DO-acre service area. The reservoir is located in Larimer County, about 1 mil~ <br />. south west of Loveland. This project indudes rehabilitation of the outlet and spillway on the dam, <br />and will allow removal of the existing storage restriction currently imposed by the State Engineer. <br />Rehabilitation work is scheduled for 2003. John Gauthiere P .E. has completed the feasibiliti <br />study. Proposed funding for the project consists of a $360,000 Small Project Loan and a $5.000 <br />Feasibility Study Grant from the CWCB, and the remainder from the Borrower. <br /> <br />. <br /> <br />" <br /> <br /> <br />.(\~y!/. <br /> <br />./ <br />,,-- <br /> <br />i- <br />I <br />