Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />South Side 1!Tig81iOn Company <br />January 22.23, 2003 <br /> <br />I <br /> <br />Agenda Item 19d <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />Borrower: South Side Irrigation Company <br /> <br />County: Larimer <br /> <br />Project Name: South Side Ditch <br /> <br />Project Type: Rehabilitation <br /> <br />Drainage Basin: <br /> <br />South Platte River <br /> <br />Water Source: Big Thompson River <br /> <br />Total Project Cost: $80,000 <br /> <br />Funding Sources: ewes and Company <br /> <br />Type of Borrower: AgriculturaVMunicipal <br /> <br />Median Household Income: Average <br /> <br />CWCB Loan: $72,000 <br /> <br />Blended Interest Rate: 3.1% Term: 30 years <br /> <br />CWCB Grant: $5,000 <br /> <br />Acre-Feet Diverted: <br /> <br />1,587 acre-feet <br /> <br />The South Side Irrigation Company operates the South Side Ditch for delivery of irrigation water <br />within a 40~acre service area. The ditch is 11 miles long and its headgate is located on the Big <br />Thompson River 4 miles west of Loveland. This projed includes rehabilitation of a number of <br />hydraulic structures, and lining portions of the ditch. Rehabilitation work is scheduled for fail 2003. <br />John Gauthiere P.E. has completed the feasibility study. Proposed funding for the project <br />consists of a $72,000 Smail Project Loan and a $5,000 Feasibiiity Study Grant from the CWCB, <br />and the remainder from the Borrower. <br /> <br /> <br />. <br /> <br />'. <br /> <br />.. <br /> <br />p. ~...== <br />. <br /> <br />. <br /> <br />. <br />. <br /> <br />- <br /> <br />. <br />. <br /> <br />. <br /> <br />~- <br /> <br />- <br /> <br />. <br /> <br />" <br /> <br />- <br /> <br />.. <br /> <br />. <br /> <br /> <br />- <br /> <br />Location Map <br />