My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02097
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:11:49 PM
Creation date
10/4/2006 7:10:11 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/27/2004
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />South Side 1!Tig81iOn Company <br />January 22.23, 2003 <br /> <br />I <br /> <br />Agenda Item 19d <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />Borrower: South Side Irrigation Company <br /> <br />County: Larimer <br /> <br />Project Name: South Side Ditch <br /> <br />Project Type: Rehabilitation <br /> <br />Drainage Basin: <br /> <br />South Platte River <br /> <br />Water Source: Big Thompson River <br /> <br />Total Project Cost: $80,000 <br /> <br />Funding Sources: ewes and Company <br /> <br />Type of Borrower: AgriculturaVMunicipal <br /> <br />Median Household Income: Average <br /> <br />CWCB Loan: $72,000 <br /> <br />Blended Interest Rate: 3.1% Term: 30 years <br /> <br />CWCB Grant: $5,000 <br /> <br />Acre-Feet Diverted: <br /> <br />1,587 acre-feet <br /> <br />The South Side Irrigation Company operates the South Side Ditch for delivery of irrigation water <br />within a 40~acre service area. The ditch is 11 miles long and its headgate is located on the Big <br />Thompson River 4 miles west of Loveland. This projed includes rehabilitation of a number of <br />hydraulic structures, and lining portions of the ditch. Rehabilitation work is scheduled for fail 2003. <br />John Gauthiere P.E. has completed the feasibility study. Proposed funding for the project <br />consists of a $72,000 Smail Project Loan and a $5,000 Feasibiiity Study Grant from the CWCB, <br />and the remainder from the Borrower. <br /> <br /> <br />. <br /> <br />'. <br /> <br />.. <br /> <br />p. ~...== <br />. <br /> <br />. <br /> <br />. <br />. <br /> <br />- <br /> <br />. <br />. <br /> <br />. <br /> <br />~- <br /> <br />- <br /> <br />. <br /> <br />" <br /> <br />- <br /> <br />.. <br /> <br />. <br /> <br /> <br />- <br /> <br />Location Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.