My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02097
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:11:49 PM
Creation date
10/4/2006 7:10:11 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/27/2004
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br />-~ <br /> <br />Mlldreal. Rothe <br />July 28-30, 2003 <br /> <br />AQenda Item 21h <br />(Updated August?, 2003) <br /> <br />. <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />Borrower: Mildred L. Rothe <br /> <br />Counties: Morgan and Weld <br /> <br />Project Name: Rothe Augmentation Plan <br /> <br />Project Type: Well Augmentation <br /> <br />Drainage Basin: South Platte River <br /> <br />Water Source: South Platte River <br /> <br />Total Project Cost: $392,758 <br /> <br />Funding Sources: ewes and Borrower <br /> <br />Type of Borrower: Agricultural <br /> <br />Median Household Income: N/A <br /> <br />CWCB Loan: $353,482 <br /> <br />Interest Rate: 2.5% Term: 30 years <br /> <br />CWCB Grant: $600 <br /> <br />Average annual well pumping: 4,800 acre-feet <br /> <br />. <br /> <br />Mildred l. Rothe is an owner of the Rothe Farm, consisting of 9,000 acres, 3055 acres of which <br />are irrigated with wells. The farm is located in Morgan and Weld Counties, near the town of <br />Orchard. The project involves construction of several recharge wells, augmentation wells, <br />recharge ponds, and pipelines. The project will generate augmentation credits to cover depletions <br />for 17 irrigation wells used on the Rothe Fann. The project will be completed by fall 2003. Brent <br />Nation, P.E., of Nation Engineering SelVices has completed the feasibility study. Proposed <br />funding for the project consists of a $353,482 Small Project Loan and a $600 Feasibility Study <br />Grant from the ewes, and the remainder from the Borrower. <br /> <br />, <br /> <br />Rothe Augmentdon Project <br /> <br />. <br /> <br /> <br />Location Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.