My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02097
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:11:49 PM
Creation date
10/4/2006 7:10:11 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/27/2004
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />VIClor and Margie Quint <br />July 28-30. 2003 <br /> <br />Agenda Item 21g <br />(Updated August 7, 20(3) <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />. <br /> <br />Borrower: Victor and Margie Quint. <br /> <br />County: MorganNJashington <br /> <br />Project Name: Quint Augmentation Site <br /> <br />Project Type: Well Augmentation <br /> <br />Drainage Basin: South Platte River <br /> <br />Water Source: South Platte River <br /> <br />Total Project Cost: 595,000 <br /> <br />Funding Sources: CWCB and Borrower <br /> <br />Type of Borrower: Agricultural <br /> <br />Median Household Income: N/A <br /> <br />CWCS Loan: 585,500 <br /> <br />Interest Rate: 2.5% Term: 30 years <br /> <br />CWCS Grant: 5600 <br /> <br />Average annual well diversions: 1.000 acre-feet <br /> <br />Victor and Margie Quint are the owners of the Quint Farm. consisting of 740 acres. The farm is <br />located in Morgan and Washington Counties, 8 miles northeast of Brush. The project invdv8s <br />oonstruction of a recharge well, a recharge pond, and a pipeline connecting the !'NO. The project <br />'Hill generate augmentation credits to cover depletions for 4 irrigation wells used by the Quint <br />Farm. The project will be completed in summer-fall 2003. Brent Nation. P.E., of Nation <br />Engineering Services has completed the feasibility study. Proposed funding for the project . <br />consists of an $85,500 Small Project Loan and a 5600 Feasibility Sludy Grant from the CWCB, <br />and the remainder from the Borrower. <br /> <br /> <br />i <br />:-:~ ,. <br /> <br />h <br />'NI <br /> <br />. <br /> <br />Location Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.