My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02095
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:11:47 PM
Creation date
10/4/2006 7:10:06 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/27/2004
Description
ISF Section - Instream Flow Appropriations - Currant Creek
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Table 5: Estimated flow Currant Creek u/s of Cottonwood Creek. <br /> <br />Exceedences <br />1% <br />5% <br />10% <br />20% <br />50% <br />80% <br />90% <br />95% <br />99% <br /> <br />Januarv Februarv March ADril Mav June Julv Auaust SeDtember October November December <br />6.98 10.07 15.30 76.55 47.26 21.55 19.81 19.45 7.44 8.42 9.04 7.65 <br />6.13 6.60 11.82 30.24 26.73 17.38 11.12 10.43 5.98 7.34 7.65 6.60 <br />5.24 5.91 9.73 14.60 20.16 14.60 9.04 7.65 5.56 6.54 6.67 5.98 <br />4.52 4.59 6.95 10.43 13.21 9.04 6.52 6.24 4.66 5.65 5.91 5.21 <br />3.62 3.62 5.35 6.95 6.95 5.84 4.28 4.59 3.82 4.31 5.01 3.82 <br />2.71 3.13 3.91 5.63 5.14 4.03 3.55 3.41 3.06 3.62 4.03 2.85 <br />2.43 2.73 3.41 4.73 4.73 3.68 3.20 3.06 2.78 3.34 3.68 2.29 <br />2.22 2.43 3.13 4.31 4.45 3.55 3.06 2.71 2.36 3.20 3.48 2.09 <br />1.45 1.04 2.78 3.57 4.00 3.20 2.78 2.02 0.51 1.31 2.78 1.59 <br /> <br /> Currant Creek Estimated Stream Flow <br /> upstream of Cottonwood Creek <br />5 / ~~ <br />4 <br /> - / "-/ '- <br /> - <br />3 <br />-n " ~, " " " ."" .,' ." ~, .,' ~, ~, ,'>C '"' .'>C',", " .'>C' "" '"' " .'>C',", .'>C' .'>C' " <br />2 <br /> " _'>C- " _'>C. _'>C. ,,_'>C. " " .'>C-" .- .- " .'>C' "" .'>C " " <br />1 <br />0 <br /> ,,^N ern MAR Affi MAY ""' U AUG see ocr NOV OK <br /> Month <br /> <br />Table 3 shows that the upper reach summer flow recommendation of 1.9 cfs is only available at <br />least 50% of the time from April 1 through July 14. The summer flow recommendation was <br />further reduced to 1. 5 cfs for the time period of July 15 through October 31 based on limited <br />water availability. Table 3 also shows that the winter flow recommendation of 1.0 cfs is <br />available at least 50% of the time from November 1 through March 31. Tables 4-5 show that the <br />lower reach summer flow recommendation of 2.0 cfs is available at least 50% of the time from <br />April 1 through October 31 and that the winter flow recommendation of 1.4 cfs is available at <br />least 50% ofthe time from November 1 through March 31. <br /> <br />Precipitation Data <br />Staff reviewed local precipitation data sets from 2 different sites located around the Thirtyone <br />Mile Creek Drainage (see Precipitation Data in Appendix C). These sites include Salida and <br />GuftY lOSE. Table 3 shows the water year and the percent of average precipitation recorded at <br />each site. <br /> <br />- 7 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.