My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02069
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:10:53 PM
Creation date
10/4/2006 7:09:01 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/13/1968
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~. STAPLETON: <br /> <br />MR. ANDERSON: <br /> <br />On Public Law 566 Watershed ~~ions, <br />on. the pine ~iver Watershed, La Plata and <br />Archuleta Counties, two floodwater-retarding <br />dams, two sections of the canal realignment, <br />and two water control structures have been <br />completed on this 58,000 acre project at a I <br />cost of $207,000. A contract in the amount <br />of $38,000 was awarded to White Construction <br />Company of Pierce, Colorado on November 1 to <br />build seven Water control stxuctures. Thirty <br />percent of the cost will be provided from <br />Four Corners Regional Commission Economic <br />Development Administration funds, fifty per- <br />cent from Public Law 566 funds and the pine <br />River Canal Company will provide the balance <br />of the cost. <br /> <br />Home Supply and Louden Watersheds. <br />Larimer and Weld counties, invitations to <br />bid are being prepared to contract con- <br />struction of additional irrigation water <br />control structures on these two projects <br />in the near future. <br /> <br />That completes the report on the Small <br />Watershed Program, Mr" Chairman." <br /> <br />"1 think we will take any questions on <br />both reports. How will. that be?" <br /> <br />"Fine. <br /> <br />The following report on the current <br />status of River Basin Survey and planning <br />activities in Colorado under the provisions <br />of Section 6 of Public La~ 566 is provided <br />fOr the Board. <br /> <br />Under River Basin Surveys, the Type 1 I <br />Comprehensive Surveys, these are the inter- <br />departmental coordinated surveys that 1 <br />have described to the Board before. On <br />the Upper Colorado region, irrigation soil <br />classes have been determined in the field. <br />A tabulation will be deve19ped and circulated <br />
The URL can be used to link to this page
Your browser does not support the video tag.