My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02069
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:10:53 PM
Creation date
10/4/2006 7:09:01 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/13/1968
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />MR. SPARKS: <br /> <br />"I think the only significant thing is <br />the short item concerning the C10sed Basin Project. <br />The Closed Basin report is still being con- <br />sidered by the Executive Branch of the govern- <br />ment, which has now had it under consideration <br />for some three to four years. It is not, <br />however, the fault of the Executive Branch <br />of the government. It is the fault of the <br />State of Colorado since we have not indi- <br />cated what our desires in the matter are as <br />yet. Once the State of Colorado takes some <br />action then I am sure that the Secretary of <br />the Interior will forward the report on to <br />Congress. <br /> <br />I <br /> <br />This matter will be touched upon later <br />in the meeting." <br /> <br />Following is the written report of Region 5, Bureau of <br />Reclamation, submitted for this meeting of the Board: <br /> <br />"Closed Basin Division, San Luis Valley Pro;ect, Colorado <br /> <br />The report of the Secretary of the Interior on the Closed Basin <br />Division, San Luis Valley project, Colorado, is under considera- <br />tion in the Executive Department of the Government. Preliminary <br />evaluation of restoration of channels of the Rio Grande and its <br />tributaries in the San Luis Valley of Colorado was made by engi- <br />neers of the Colorado Water Conservation Board and the Bureau of <br />Reclamation. This preliminary evaluation was presented to the <br />Colorado Water Conservation Board at its September 5 meeting in <br />Alamosa, Colorado. The five-stage plan for the Closed Basin Divi- <br />sion is being repriced to the current price base by the Chief <br />Engineer. <br /> <br />San Juan-Chama Pro;ect, Colorado-New Mexico <br /> <br />Progress on construction contracts is as follows: <br /> <br />Azotea Tunnel and appurtenant <br />structures - - - - - - <br /> <br />86.5 <br /> <br />I <br /> <br />Contract <br /> <br />Approximate percent complete <br /> <br />Blanco Tunnel, diversion dam, and <br />appurtenant structures - - <br /> <br />96.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.