Laserfiche WebLink
<br />Section 1 <br />Project Team Minimum Qualifications (RFP Section 4.3) <br /> <br />1.2 Predetermined Tudmnents (RFP 4.3.7) <br /> <br />The Bouvette Consulting Team does not have any predetermined judgments' or expected <br />recommendations conceming the outcome of the DPSCSA. We will perform all'services in an <br />objective and unbiased manner to the benefit of CWCB and the State of Colorado. <br /> <br />1.3 References (RFP 4.3.8\ <br />References provide in Section 3 of this proposal will verify that our Team exceeds all of CWCB's <br />minimum requirements for this project. <br /> <br />Section 1, Page 8 <br /> <br />. <br /> <br />. <br /> <br />. <br />