My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02030
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:10:09 PM
Creation date
10/4/2006 7:07:23 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/24/1999
Description
WSP Section - Colorado River Basin Issues - Colorado River Reservoirs Annual Operating Plan
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />~ <br /> <br />Agenda Item 9p <br />May 24-25,1999 Board Meeting <br />Page 3 of3 <br /> <br />Conclusion <br />Based on the May 10, 1999 forecast, the 1st draft of the year 2000 AOP will allow for a <br />surplus declaration in an amoWlt that would satisfy all present lower basin demands. <br />Upper Basin 602(a) storage criteria will not he controlling and supplies are adequate to <br />assure deliveries to comply with Article III(c) and III(d) of the 1922 Compact. Spill <br />avoidance and/or storage equalization criteria in accord with Article II(3) of the <br />Operating Criteria will control releases from Glen Canyon in 2000 Wlless the forecast <br />declines to the point that the minimum objective release (8.23 mat) criteria in Article <br />II(2) become controlling. As noted in the schedule, the Upper Basin states reserved the <br />right to delay final decision on a surplus declaration Wltil July 15th. <br />
The URL can be used to link to this page
Your browser does not support the video tag.