My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01987
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:09:40 PM
Creation date
10/4/2006 7:06:10 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/13/1998
Description
CF Section - Greeley and Loveland Irrigation Company - Horseshoe #2 Reservoir Outlet Rehabilitation
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />@ <br /> <br />. <br /> <br />BOYLE EnGinEERinG CORPORRT/on <br /> <br />Suite 200 <br />165 South Union <br />Lakewood, CO 80228 <br /> <br />CONSULTING ENGINEERS <br /> <br />303 I 987 . 3443 <br />FAX 303 I 987 . 3908 <br /> <br />EXHIBIT A <br />Horseshoe Outlet Works Rehabilitation Study <br />Plan of Study <br /> <br />INTRODUCTION <br />This Plan of Study (POS) for the Horseshoe Outlet Works Rehabilitation Study was prepared to adhere to the <br />Colorado Water Conservation Board (CWCB) fonnat as presented in Guidelines for Financial Assistance <br />through the Colorado Water Conservation Board Construction Fund. The POS was developed to <br />systematically evaluate project requirements and tailor the end product to meet these requirements. The <br />process is built on identifYing needs, then collecting information and developing solutions in a series of well- <br />defined steps. The process will utilize valued feedback from the Greeley and Loveland Irrigation (Company) <br />and the CWCB to evaluate progress and reassess results. The schedule is based on the assumption that the <br />contract award will take place on or before June 12, 1998 and the completion date of the draft report on July <br />7,1998. <br /> <br />The feasibility study will address structural and nonstructural solutions for the outlet works rehabilitation. The <br />selected alternative developed during the feasibility study will go into final design and construction. <br /> <br />. <br /> <br />STUDY OBJECTIVE <br />The objective of the study is to select a financially sound alternative to rehabilitate Horseshoe Outlet Works, <br />which will enable them to deliver their full water decree in a safe and expeditious manner to meet their <br />shareholders present and future water requirements. <br /> <br />DETAILED WORK TASKS <br />The following POS is based on seven (7) major activities. Each will result in the preparation of one or more <br />deliverables that will be submitted for review and approval in accordance with the attached schedule. The task <br />descriptions are arranged in the order of their performance with the exception of Task 7 Coordination <br />Meetings. It is anticipated that project meetings will be held bi-weekly. A summary of the deliverables for <br />the Horseshoe Outlet Works Feasibility Study are shown in the following table: <br /> <br /> Task No. Description Prod uct <br /> I Data Collection Memorandum <br /> 2 Alternative Development Memorandum <br /> 3 Alternative Evaluation Memorandum <br /> 4 Financial Analysis Memorandum <br /> 5 Study Report Report <br />. 7 Coordination Meetings Progress Reports <br />
The URL can be used to link to this page
Your browser does not support the video tag.