<br />ChanJ!eOrderNo.5 andNo. 6-Preble'sHabit'at
<br />
<br />The cost provided by the Contractor in Change Order No.3 for the construction of the .
<br />mouse habitat indicated a cost of$4,Ol per cubic yard to place 26,000 cubic yards for a total cost of
<br />$104,173, It was understood that the Contractor's price per cubic yard was based on using on-site
<br />material, but not dredge material, If the Contractor would choose to use dredge material to
<br />construct the mouse habitat area, the $104,173 would b~ credited back the Town of Monument and
<br />the Contractor would be paid based on the unit price :for dredging, less a credit for disposing the
<br />dredging material on-site, The Contractor elected to construct the habitat area with dredged
<br />material,
<br />
<br />Reduction in cost = $104,173 + $13,132,50 (credit) = ($117,305.50)
<br />
<br />Per the terms of the Army Corps of Engin<ler's Individual 404 Permit and Biological
<br />Assessment the Town of Monument was required to construct a portion of the new 25-foot wide
<br />mouse habitat corridor just north of the southern line pf Zone 4b, prior to May 15, 2002. Given
<br />time restrictions imposed, the Town of Monument elected to have the work performed by the
<br />Contractor to ensure that it was completed on time, .
<br />
<br />Additional cost = $3,108,24
<br />
<br />The following is a summary of all additional ~ost incurred by the Town of Monument and
<br />its Contractor:
<br />
<br /> Original Cost Actual Cost Variance .
<br /> Estimate Incurred
<br />* Spillway Rehabilitation $815,640
<br />* Chimney/Blanket Drain $1,077,900
<br />* Upstream Gate $262,080
<br />* Dredging $450,000
<br />* Borrow Material $20,000
<br />Totals: $2,625,620 ASI -$2,775,060 $149,440
<br />* Change Order No, 1 $0 $46,732 $46,732
<br />* Change Order No, 2 and 3 $0 $317,409 $317,409
<br />* Change Order No, 4 $0 $147,500 $147,500
<br />* Change Order No, 5 and 6 $0 ($114,198) ($114,198)
<br />* Design/Const. Engineering $450,000 $692,460 $242,460
<br />* Environmental Engineering $0 $71,498 $71,498
<br />* Land Acquisition $0 $167,245 $167,245
<br />* Contract Contigency $0 $61,299 $61,299
<br />* Prebb1es Habitat $0 $153,750 $153,750
<br />(Costs not included in Change Orders 3.6)
<br />* Feasibility Report $5,000 $5,000 $0
<br />Totals: $3,080,620 $4,323,755 $1,243,135 .
<br />