Laserfiche WebLink
<br /> <br />" <br /> <br />ChanJ!eOrderNo.5 andNo. 6-Preble'sHabit'at <br /> <br />The cost provided by the Contractor in Change Order No.3 for the construction of the . <br />mouse habitat indicated a cost of$4,Ol per cubic yard to place 26,000 cubic yards for a total cost of <br />$104,173, It was understood that the Contractor's price per cubic yard was based on using on-site <br />material, but not dredge material, If the Contractor would choose to use dredge material to <br />construct the mouse habitat area, the $104,173 would b~ credited back the Town of Monument and <br />the Contractor would be paid based on the unit price :for dredging, less a credit for disposing the <br />dredging material on-site, The Contractor elected to construct the habitat area with dredged <br />material, <br /> <br />Reduction in cost = $104,173 + $13,132,50 (credit) = ($117,305.50) <br /> <br />Per the terms of the Army Corps of Engin<ler's Individual 404 Permit and Biological <br />Assessment the Town of Monument was required to construct a portion of the new 25-foot wide <br />mouse habitat corridor just north of the southern line pf Zone 4b, prior to May 15, 2002. Given <br />time restrictions imposed, the Town of Monument elected to have the work performed by the <br />Contractor to ensure that it was completed on time, . <br /> <br />Additional cost = $3,108,24 <br /> <br />The following is a summary of all additional ~ost incurred by the Town of Monument and <br />its Contractor: <br /> <br /> Original Cost Actual Cost Variance . <br /> Estimate Incurred <br />* Spillway Rehabilitation $815,640 <br />* Chimney/Blanket Drain $1,077,900 <br />* Upstream Gate $262,080 <br />* Dredging $450,000 <br />* Borrow Material $20,000 <br />Totals: $2,625,620 ASI -$2,775,060 $149,440 <br />* Change Order No, 1 $0 $46,732 $46,732 <br />* Change Order No, 2 and 3 $0 $317,409 $317,409 <br />* Change Order No, 4 $0 $147,500 $147,500 <br />* Change Order No, 5 and 6 $0 ($114,198) ($114,198) <br />* Design/Const. Engineering $450,000 $692,460 $242,460 <br />* Environmental Engineering $0 $71,498 $71,498 <br />* Land Acquisition $0 $167,245 $167,245 <br />* Contract Contigency $0 $61,299 $61,299 <br />* Prebb1es Habitat $0 $153,750 $153,750 <br />(Costs not included in Change Orders 3.6) <br />* Feasibility Report $5,000 $5,000 $0 <br />Totals: $3,080,620 $4,323,755 $1,243,135 . <br /> <br />