My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01934
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01934
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:08:59 PM
Creation date
10/4/2006 7:05:04 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/25/2002
Description
CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />the dam embankment and the potential for failure, the dam was intentionally breached in 1983, The <br />proposed project involves rehabilitating the existing dam embankment, the construction of a controlled outlet . <br />structure, and the construction of an emergency spillway. The project is currently being design by the <br />Applegate Group, Denver, Colorado, and is scheduled for construction in the Spring of2003. <br /> <br />. <br /> <br />. <br /> <br />39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.