Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Colorado completed the final design and has been monitoring the proj ect during construction. Robison <br />Construction, Inc., (RCI) the Contractor, commenced construction in December of2000, and is tentatively <br />scheduled to be finalized in February 2003, The project is currently 95% complete, <br /> <br />3. Windsor Reservoir and Canal Companv - Various Canal and Reservoir Rehabilitations <br />Authorization: SB 96-153 County: Larimer- N; of Ft. Collins <br />Water Source: Cache La Poudre Project Yield: 30,000 ac. ft. <br />Terms of Loan: $2,357,000 @4.15% for 30 years Project Type: Canal/Res. Rehabilitation <br /> <br />In 1995 the Windsor Reservoir and Canal Company retained the services of Smith Geotechnical to evaluate <br />the current condition of their 25 miles of canal and 6 reservoirs, Smith Geotechnical identified approximately <br />$3,400,000 in recommended improvements, with a proposed design and construction time frame of 15-years, <br />The projects identified consisted of the Poudre Valley Canal, Cobb Lake Pipeline and Outlet/Inlet Structures, <br />Windsor Reservoir No.8, Annex No, 8 and Elder Reservoir Outlet Structure. The Poudre Valley Canal and <br />the Cobb Lake improvements have been designed and constructed, The construction of Elder Reservoir was <br />completed October of 200 1, constructed by Zak Dirt, from Longmont, CO, Barker Construction is currently <br />performing improvements to Annex No, 8 and Windsor No, 8 Reservoirs, which are scheduled to be <br />completed by December of2002, r <br /> <br />4. North Poudre Irrigation Companv - Reservoirs No.4. 5 and Indian Creek Rehabilitation <br />Authorization: HE 98-173 County: Weld - N, of Fort Collins <br />Water Source: Cache La Poudre Project Yield: 9,363 acre feet <br />, Terms of Loan: $1, I 07 ,000 @ 4,04% for 20 yrs.Project Type: Reservoir Rehabilitation <br /> <br />This project involves the rehabilitation of Reservoirs 4,5 and Indian Creek. The Irrigation Company has <br />retained the services of Smith Geotechnical, out of Fort Collins, Colorado to prepare design plans and <br />specifications for the proposed improvements. Improvements to Reservoir No.5 were designed and <br />completed in 1999, Reservoir 4 is currently under design and is tentatively scheduled for construction in the <br />fall of 2003, The proposed improvements to Indian Creek Reservoir involve a new 500-ft. long spillway, <br />replacement of the outlet structure, new toe drains, and reshaping the downstream dam face. The proposed <br />improvements to Reservoir No.4 include, relocation of the spillway to the center of the dam, replacing the <br />existing outlet structure and Parshall flume, new toe drains, rip rap placement, and reshaping the upstream face <br />of the dam. The design for Indian Creek Reservoir is complete and construction was awarded to Zak Dirt, <br />Longmont Colorado, Indian Creek Reservoir is anticipated to be completed by June of2003. <br /> <br />5, Summit Reservoir and Irrigation Coml'anv <br />Authorization: SB-97 -008 <br />Water Source: Lost Canyon Creek <br />Terms of Loan: $300,000@3.75% for 30-years <br /> <br />County: Montezuma - NE of Cortez <br />Project Yield: 4,287 ac, ft. <br />Project Type: Reservoir and Ditch Rehab. <br /> <br />This $270,000 project is the rehabilitation of the Summit Reservoir Dam outlet works and therepair and <br />improvements to the Summit Reservoir and Irrigation Company's water collection and distribution facilities, <br />The Cortez office of Natural Resource Conservation Service prepared the construction plans and <br />specifications, Construction for the Walker Drops improvements commenced in March of 1999, by Noland, <br />Inc., of Mancos, CO" and was completed in July of 1999, The second to last phase of the project was <br />completed in October of2001. That final remaining phase of the project is anticipated to be complete by the <br />fall of 2003, <br /> <br />6. The Town of Monument - Monument Dam Rehabilitation <br />Authorization: Severance Tax Trust Fund County: El Paso - W. of Monument <br />Water Source: Monument Creek Project Yield: 450 acre-feet <br />Terms of Loan: $2,443,000@5.50% for 30-years Project Type: Dam Rehabilitation <br /> <br />32 <br />