My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01934
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01934
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:08:59 PM
Creation date
10/4/2006 7:05:04 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/25/2002
Description
CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Following extensive discussions, the parties involved have agreed that the water to which the San . <br />Luis Rey Tribes are entitled - which will become ll.vailable through the lining of the All American <br />and Coachella canals - will be made available for leasing by the Metropolitan Water District. <br /> <br />Arizona Water Rights Settlement Act: On Sept. 24, Senators Jon Kyl (R-AZ) and John McCain (R- <br />AZ) introduced the Gila River Indian Community Water Rights Settlement Act. S. 2992 would make <br />adjustments to the Central Arizona Project (CAP) and the Southern Arizona Water Rights Settlement <br />Act of 1982. The bill is the result of over five years of negotiations between state, tribal and federal <br />representatives. <br /> <br />Smce Arizona began receiving CAP water from tqe Colorado River, litigation has divided water u: . rs <br />over how the CAP water should be allocated and t:;xactly how much Arizona was required to repay <br />. 'the, federal government. This bill will codify the settlement reached between the United States and.ie <br />C;ehtral Arizona Water Conservation District over the state's repayment obligation. It will also resol\e <br />the allocation of all remaining CAP water. In addition, approximately 200,000 acre-feet of CAP <br />water will be made available to settle various lndi<m water claims, The::bill also authorizes the use' <br />, the Lower Colorado River Basin Development Fuhd, which is funded solely from revenues paid by <br />Arizona entities, to construct irrigation works necessary for tribes with congressionally approved <br />water settlements to use CAP water. <br /> <br />Upper Colorado River Recovery Implementation Program - Coordinated Facilities Stndy: <br />Brpwn & Caldwell has resumed modeling for the Coordinated. Facilities Study. Modeling ceased fr. <br />several months while the StateMod code and data sets were updated ~o match current reservoir <br />eJOChange operations and recovery actions. The new results more closely match current operations 1 Jt <br />do not change the overall results and conclusions ofthe study. The draft final report should be givel1 . <br />to the technical committee for review by December. The study and final report should be complete <br />by March 2003. ' <br /> <br />Colorado Decision Support System: The irrigated acreage update for the western slope has been <br />completed and will be loaded into HydroBase by the end of 2002. The Gunnison River Basin <br />StateMod data set is being updated to include recent irrigated acreage, climate, streamflow and <br />diversion data and more detailed information for the upper Gunnison basin. Improvements to the <br />StateMod CI run for Colorado River mainstem w~re completed. in October. Other updates to the <br />Colorado River data sets will be made in 2003 in preparation for extensive use of the Colorado River <br />model in future years for consumptive uses and lo~ses calculations and for depletion accounting for <br />the Recovery Program. . <br /> <br />Ray Alvarado also gave a presentation on the CD$S to Colorado members of the USGS National <br />Water-Quality Assessment (NA WQA) Program iI). November. <br /> <br />NOAA CDC Forecasting Project: We continue to work with the NOAA Climate Diagnostics <br />Center (CDC) and Colorado Basin River Forecast! Center (CBRFC) to improve local springtime <br />weather and streamflow forecasts for the Colorad~ and Gurmison river basins. Improved forecasts are <br />expected to aid reservoir operators, water planner~, and water users in their efforts to be efficient and <br />maximize their resources as they make spring storage and release decisions, demand projections, <br />cooperate in efforts to enhance spring peak flows for endangered fish, flood control measures and <br />other competing issues. <br /> <br />Colorado River Salinity Control Program: Salinity levels in the river remain well below the <br />established standards at Hoover, Parker and Impetial. However, the reductions in salinity are making . <br />it increasingly difficult to meet the differential (1 5 +/- 30 mgll) at the Northern International <br /> <br />J1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.