Laserfiche WebLink
<br />.) .,. <br /> <br />~b <br /> <br />ROXBOROUGH PARK METROPOLITAN DISTRICT <br /> <br />. October 28, 2004 <br /> <br />Larry Lang <br />Colorado Water Conservation Board <br />Flood Protection Section <br />1313 Sherman Street, #721 <br />Denver, CO 80203 <br /> <br />Re: Roxborough Park Metropolitan District <br />Wastewater Pipeline <br /> <br />Dear Mr, Lang: <br /> <br />Please fmd attached a Colorado Water Conservation Board (CWCB) Easement Request Application for CWCB <br />Right-of-Way along the South Platte River, Chatfield Downstream Channel Improvement Project. This request is <br />to accommodate construction of a proposed pipeline for transmission of wastewater from Roxborough Park <br />Metropolitan District (RPMD) to the Littleton Englewood Wastewater Treatment Plant (WWTP), As part of the <br />proposed project, RPMD will provide wastewater service to Lockheed Martin Space Systems (LMSS), which will <br />permit closure of both the RPMD and LMSS wastewater treatment facilities, Currently, both treatment plants. <br />discharge into the South Platte River upstream of Chatfield Reservoir, The proposed WWTP regionalization <br />project will result in a reduction in the discharge of phosphorus and other nutrients to Chatfield Reservoir which <br />will provide water quality benefits to the reservoir and South Platte River downstream of the reservoir_ <br /> <br />. <br /> <br />The proposed pipeline will connect to an existing City of Littleton wastewater pipeline at the intersection of Santa <br />Fe Drive and Belleview A venue, extend upstream on the east side of the South Platte River and cross the river <br />midway between Belleview Avenue and Prince Street, then generally parallel the west side of the South Platte <br />River past the southerly limits of CWCB property, The overall length of the requested easement(s) is just over <br />two miles (11,000 feet), Construction is tentatively scheduled for completion by December 2006, <br /> <br />There are a number of governmental entities and agencies that are currently involved with this project, These <br />include Chatfield Watershed Authority, City of Littleton, South Suburban Parks and Recreation District, Colorado <br />Department of Public Health and Environment, US AnnyCorps of Engineers, Denver Water, Colorado <br />Department of Transportation, Centennial Water and Sanitation District, Denver Regional Council of <br />Governments, and Colorado.Water Conservation Board. <br /> <br />Also attached is a vicinity map showing the overall scope of the project from the RPMD WWTP to the City of <br />Littleton connection point, and a more detailed project map delineating CWCB property and 'the proposed <br />pipeline alignment along the South Platte River between Belleview Avenue and Mineral Avenue, <br /> <br />RPMD is requesting consideration of this easement request application by the Board of Directors at the November <br />16 through 17, 2004 Board Meeting with a consensus of support for the project. With such indication of support, <br />RPMD will formally defme and describe all easements and submit a fmal application for review and approval at <br />the January 2005 CWCB Board Meeting, <br /> <br />Sincerely, <br /> <br /> <br />iJ /1~- <br />L~~re <br /> <br />General Manager <br />Roxborough Park Metropolitan District <br /> <br />6222 N. Roxborough Parh Rd. - Littleton, CO 80125 - FAX (3031933-3649 - Phone (3031979-7286 <br />