Laserfiche WebLink
<br />projects of CRBSCP, a new authorization in FY 1975. <br />2. Construction program <br /> <br />Total <br /> <br />$14,549,000 <br /> <br />I <br /> <br />Program provides for construction activities on the <br />Curecanti Unit, Transmission Division, Bostwick park <br />Project, and lining Gunnison Tunnel of Uncompahgre <br />Project. <br /> <br />3. O&M program <br /> <br />Total <br /> <br />$18,588,000 <br /> <br />Program provides for operation and maintenance activities <br />of the main stream reservoirs of the Colorado River plus <br />the Collbran project. <br /> <br />B. General Investigations <br /> <br />1. Basalt Pro~ <br /> <br />a. A status report is now being prepared. <br /> <br />b. C01ll1llents from Washington and Denver have been received. <br /> <br />c. Report should be available early next year. <br /> <br />d. The report explores <br /> <br />(1) <br />(2) <br /> <br />Pumping plans for M&I use <br /> <br />Gravity diversion for irrigation and residential <br />water with water supply obtained from Reudi <br />Reservoir. <br /> <br />I <br /> <br />(3) Competition for use of Reudi water <br /> <br />2. Upper Gunnison and Grand Mesa Proiects <br /> <br />a. In FY 1973, concluding reports were completed, and <br />both were widely circulated. <br /> <br />b. Both reports preserve for future reference the results <br />of extensive feasibility investigations made by <br />traditional methods of evaluation before the new <br />principles and standards were approved. <br /> <br />c. Neither the Grand Mesa nor Upper Gunnison report <br />recommended further federal action at this time. <br /> <br />3. Uncotll1:lahgre proiect Improvement <br />a. The project presently provides 356,000 acre-feet of <br /> <br />-6- <br />