Laserfiche WebLink
<br />1 <br />, <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />AGRICULTURAL DITCH & RES. CO. - AG DITCH!WELCH DITCH IMPROVEMENTS <br /> <br /> <br />The Agricultural Ditch Pump Station at Colfax Avenue and Orchard Drive <br /> <br />Proiect Descrintion <br />This $400,000+ project, located in Jefferson County east of Green Mountanin, abandoned <br />portions of the Welch Ditch by construction of a dropout structure on the Welch Ditch to the Ag <br />Ditch, and a pump station/pipeline to lift water from the Agricultural Ditch back to the Welch <br />Ditch, Several landslide areas along the Welch Ditch that continued to create high maintenance and <br />water delivery problems for the company necessitated the project. Mountain States Engineering <br />Associates, Inc, of Lakewood prepared the project design, The pipeline, constructed by T, Lowell <br />Construction, Inc, of Castle Rock, and the pump station and dropout-structure, constructed by <br />Jennison Construction Co, of Littleton, commenced November 3, 1997 were completed in July <br />1998, Project documentation was received for substantial completion on October 31, 1998, <br />Proiect Data <br /> <br />Sponsor: Agricultural Ditch & Res, Co, <br /> <br />County: Jefferson <br /> <br />River: Clear Creek <br /> <br />Terms of Loan: $300,000 @ 5,25% for 30 yrs <br /> <br />Substantial Completion Date: Oct. 31, 1998 <br /> <br />Design Eugineer: Mountain States Engineering Associates, Inc, - Lakewood, Colorado <br /> <br />Construction Contractors: T, Lowell Construction, Inc, - Castle Rock, Colorado (pipeline) <br />Jennison Construction Company, Inc, - Littleton, Colorado <br /> <br />Desigu Criteria: <br /> <br />Pipeline Length = 5,000 ft, of various dia, PVC pipe <br />Pump Station = 3 - 75 HP pump motors Dropout Pipe = 36 in, CMP <br /> <br />Annual Volume of Water Delivered by the Project: 1,000 ac,ft, <br />