Laserfiche WebLink
<br />!.: <br /> <br />. <br /> <br />FARMERS PAWNEE CANAL CO. - DIVERSION STRUCTURE REHABILITATION <br /> <br /> <br />Placement of the Sheet Piling Along the Upstream Face of the Diversion Structure <br /> <br />. <br /> <br />Proiect Dcscrintion <br /> <br />This project was the rehabilitation of the Farmers Pawnee Canal Company's diversion and <br />headgate structure on the South Platte River. The project included the installation of sheet piling <br />and construction of a concrete toe wall, The project restores damage caused by the July 1997 <br />Pawnee Creek flood and protects the benefit of irrigation water to about 10,000 acres of cropland, <br />The project was designed by the NRCS, Sterling office and constructed by R&R International, Inc, <br />of Denver. Construction commenced March 16, 1998 and was completed April 15, 1998, Project <br />documentation was received for substantial completion on September 23, 1998, <br /> <br />Proiect Data <br /> <br />Sponsor: Farmers Pawnee Canal Company Connty: Logan <br /> <br />River: South Platte River <br /> <br />Terms of Loan: $22,250@3,5% for 10 yrs <br /> <br />Substantial Completion Date: Sept 23,1998 <br /> <br />Design Engineer: Natural Resource Conservation Service - Sterling, Colorado Office <br /> <br />Constrnction Contractor: R&R International, Inc, - Denver, Colorado <br /> <br />Design Criteria: Length = 288 ft <br /> <br />Sheet Piling = 5,532 sq,ft, <br /> <br />Concrete Toe Wall = 44 cu,yd <br /> <br />. <br /> <br />Annual Volnme of Water Delivered by the Project: 28,000 ac,ft, <br />