My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01879
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01879
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:08:17 PM
Creation date
10/4/2006 7:04:11 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/13/1998
Description
WSP Section - Colorado River Basin Issues - Paradox Valley Unit Augmentation Operations
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~u~-~u .JJ_ ----- <br /> <br />< <br /> <br />3. DELlVERYOFWATER <br /> <br />. <br /> <br />a. Reclamation hereby leases to the Service. and the Service hereby subleases to the Board, a <br /> <br /> <br />maximum of21,6SO acre-feet of water from the regulatory capacity ofRuedi Reservoir, as <br /> <br /> <br />defined in Article 8. hereof, subject to the terms and conditions oftbis MOA. ~ater shall be <br /> <br /> <br />released from Ruedi Reservoir for use by the Service and the Board in and through the IS-mile <br /> <br /> <br />reach as descn"bed in Article 6.a. herein. <br /> <br />b. Reclamation shall deliver the water under this MOA into the Fryingpan River at the outlet <br /> <br /> <br />works ofRuedi Reservoir. All delivery of water will be limited by the capacity of the outlet <br /> <br /> <br />works. <br /> <br />. <br /> <br />c. All water releases will be measured at the outlet works by the Contracting Qfficer with <br /> <br /> <br />equipment furnished, operated, and maintained by Reclamation. The Service shall install, <br /> <br /> <br />operate; maintain, and replace any waterl10w measuring and recording devices necessary to <br /> <br /> <br />accept delivery and protect the water in the 1 S-mile reach. <br /> <br />d. The amount, timing, and rate of the releases from-Ruedi Reservoir shall be determined by the <br /> <br /> <br />Contracting Officer in consultation with the Service. Reclamation will provide advance <br /> <br /> <br />notification to the Board and the Division Engineer for Water Division 5 of the date, time, and <br /> <br />a <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.