My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01820
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01820
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:07:43 PM
Creation date
10/4/2006 7:03:10 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
4/14/1965
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />burden of carrying on on the Narrows Unit, <br />the investigations on the Poudre, and the <br />South Fork of the Platte, with the necessity <br />of carrying on and bridging the gap without <br />loss of time. We have selected Mr. Morry <br />Droskin to take over those duties and he is <br />here with us today. I would like to introduce <br />him to the Board at this time. Mr. Droskin, <br />will you stand? <br /> <br />The reconnaissance report on the upper <br />South Platte Unit was reviewed by the Commis- <br />sioner. We are now in the process of print- <br />ing this in final form and it should be avail- <br />able to you for information purposes in the <br />near future. In the interim we are proceed- <br />ing with the collection of detailed geologic <br />data at the damsi te on the South Fork. We <br />have completed construction of temporary <br />bridges to facilitate this work. The hydro~ <br />logic studies for the feasibility investiga- <br />tions have been started. So we are losing no <br />time in moving forward on the feasibility <br />studies of the unit. <br /> <br />The st. Vrain Unit has been limited to <br />the activities involved in Steering Committee <br />meetings, exchange of information and being of <br />whatever service we can to those interests. <br /> <br />We are completing the design stages for <br />Idylwilde Reservoir on the poudre and the <br />hydrology studies are nearing completion. We <br />are beginning to get to the point where we <br />will draw that plan together. <br /> <br />I <br /> <br />On the Trinidad Project we are working <br />on the initial phases of repayment contract <br />negotiations. An important problem on the <br />Trinidad project is the transfer of the Model <br />decree to the Trinidad Reservoir. Tentative <br />approval for transfer of the storage rights <br />was given but there have been additional hear- <br />ings scheduled, originally for April 9th but <br />we now understand that these will be finalized <br />tomorrow. <br />
The URL can be used to link to this page
Your browser does not support the video tag.