Laserfiche WebLink
<br />Agenda Item 120 <br />February 25, 1993 <br />Page two <br /> <br />Potential for Inim)' <br /> <br />The proposed exchange of water released from Clinton Gulch Reservoir to storage <br />in the Swan River Water System Ponds, Goose Pasture Tarn, and Breckenridge Reservoirs <br />may deplete the Board's instream flow rights on the Blue River. Additionally, the proposed <br />augmentation sources may not replace out-of-priority depletions from the Swan River Water <br />System and the Breckenridge Pipeline. <br /> <br />Other Objectors <br /> <br />There are no other objectors in this case. However, at the time this memo was <br />prepared, the period for filing statements of opposition to this application had not yet <br />expired. <br /> <br />Staff Recommendation <br /> <br />The staff recommends that the Board ratify the statement of opposition filed in this <br />case to protect the Board's instream flow rights on the Blue River. <br /> <br />DCM/GDE/gl <br /> <br />Attachment <br /> <br />592CW299.mem <br /> <br />, <br /> <br />. <br /> <br />. <br /> <br />. <br />