My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01780
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01780
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:06:56 PM
Creation date
10/4/2006 7:02:13 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/21/2002
Description
Summary Minutes and Record of Decisions - March 21-22, 2002
Board Meetings - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-7 - <br /> <br />Action: <br /> <br />Information item; no action taken. <br /> <br />22. <br /> <br />Drought Planning Assessment <br />Track 3, Start/Stop: <br />Action: Information item; no action taken. <br /> <br />10203 - 15305 <br /> <br />23a. Flood Protection Program - Army Corps of Engineers Budget Report and Colorado <br />Service Center Projects <br />Track 3 Start/Stop: 31800 - 33516 <br />Action: Information item; no action taken. <br /> <br />23b. Flood Protection Program - South Platte River Easement Request <br />Track 3 Start/Stop: 33516 - 34303 <br />Action: A motion was made by Eric Wilkinson that the Board I) accept the staff <br />recommendation to approve the construction easement and non-exclusive <br />easement request for the Big Dry Creek Trail for the South Suburban Park and <br />Recreation District for the construction of a pedestrian bridge and connecting <br />trail features on CWCB right-of-way under Method III fee considerations; 2) <br />authorize the staff to prepare the necessary easement documents and that the <br />Director to execute said documents; and, 3) that the grantee should replace and <br />reclaim all existing project features. The motion was seconded by Ray Wright <br />and approved (7-0). <br /> <br />23c. Flood Protection Program - 2002 Flood and Drought Outlook <br />Track 3 Start/Stop: 34303 - 42100 <br />Action: Information item; no action taken. <br /> <br />23d. Flood Protection Program - Flood Response Program Component Update <br />Track 3 Start/Stop: 42100 - 42248 <br />Action: Information item; no action taken. <br /> <br />23e. Flood Protection Program - Extreme Precipitation Study Update <br />Track 3 Start/Stop: 42248 - 43105 <br />Action: Information item; no action taken. <br /> <br />23f. Flood Protection Program - Floodplain Mapping Program <br />Track 3 Start/Stop: <br />Action: Information item; no action taken. <br /> <br />43105 - 43910 <br /> <br />23g. Flood Protection Program - Floodplain Designation Update <br />Track 3 Start/Stop: <br />Action: This item was tabled till May. <br /> <br />43910 - 44233 <br /> <br />23h. Flood Protection Program - Technical Document Approval <br />Track 3 Start/Stop: <br />Action: This item was tabled till May. <br /> <br />44233 - 44444 <br /> <br />23i. Flood Protection Program - Stream Restoration Program Proposal <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.