Laserfiche WebLink
<br />a. Type of organization, official name, the year formed, and the statutes under which <br />the entity was formed. For private entities, a copy of the Articles of Incorporation a <br />and By-laws should be appended to the report. .. <br />b, For public entities, the number of customers, taps, etc, served, and current water <br />usage, and future growth plans, <br />c, For private entities, the number of members or shareholders and shares of stock <br />outstanding or a description of other means of ownership, and current water <br />delivery. <br />d, A brief history of the sponsoring entity, <br />e. Identification of revenue sources (existing service charges, tap fees, share <br />assessments, etc,). <br />f. A description of existing water supply facilities owned and/or operated by the <br />entity, <br /> <br />2.3 Water Riehts <br /> <br />2,3.1 Water Availabilitv <br /> <br />The Loan Feasibility Study should provide a detailed description and analysis of each <br />water supply source to be utilized by the proposed project. (A brief description of existing <br />sources may be adequate for projects that involve only rehabilitation of existing facilities), <br />Each. source of supply should be described in terms of location, yield, extent of <br />development, and water rights status, Maps and schematic diagrams should be included <br />as a part of the description, <br /> <br />tit <br /> <br />For surface water sources, the description should include a numerical and graphical <br />tabulation of annual flows and average monthly flows for the period of record on each <br />stream. For groundwater sources, the source aquiferes) and the expected yields and <br />reliability of wells should be identified. A complete tabulation of water rights for each <br />surface water source should also be provided to include appropriation dates, adjudication <br />dates, status of adjudication (absolute or conditional), and amounts decreed to direct flow <br />or to storage, For groundwater sources, the status of well permits and history of use <br />should be provided, <br /> <br />For new water supply facilities or the expansion of existing facilities, an analysis of the <br />expected yield of water supply sources should be included in the Loan Feasibility Study, <br />The analysis should be performed in such a way as to take into account a reasonable range <br />of variations in flow due to hydrologic and meteorological conditions as well as the <br />operation ofthe water rights priority system, <br /> <br />2.3.2 Water Supply Demands <br /> <br />Existing and future water demands are analyzed, as well as the adequacy of water <br />rights/existing yields, and water demand and availability are compared, Study area <br />water demands are generally.estimated for a selected planning horizon or period of time, a <br />Typically, a planning horizon should be at least as long as the CWCB loan period, .. <br />Demands are estimated for the study planning horizon and compared with the yields of <br />existing supplies, If the comparison indicates a water supply deficit at some point during <br /> <br />7 <br />