My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01768
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01768
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:06:48 PM
Creation date
10/4/2006 7:02:04 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/26/2000
Description
CF Section - Non-Reimbursable Projects - Bosley Wash Feasibility Study
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,'. <br /> <br />. <br /> <br />. <br /> <br />STAFF RECOMMENDATION <br /> <br />Staff recommends that the Board request the General Assembly authorize up to <br />$65,000 from the CWCB Contruction to be appropriated as matching grant funds to the <br />Grand Junction Drainage District and Mesa County, Colorado to complete the Bosley <br />Wash Feasibility Study and demonstration project, The grantees may allocate the <br />$65,000 in the following manner: up to $50,000 for the Feasibility Study and up to <br />$25,000 for the demonstration project, with total expenditures not to exceed $65,000, <br /> <br />L:/boardmem/jan2000/12a bosley wash,doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.