My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01698
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01698
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:05:57 PM
Creation date
10/4/2006 7:01:06 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
12/14/1966
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />scheduled for completion in F. y. 1968. <br /> <br />Feasibility designs and estimates are <br />being prepared for sections of the Josephine <br />Basin Canal and Yello,,, ,Jac"et Canal, Bilk Creek <br />canal, Lost Pa~, Collection system, and project <br />laterals. Assembly of design data for other <br />project feat\::ces is in progr~ss. The project <br />lands and drainage appendic8s are essentially <br />completed and work is continuing on the plan <br />formulation, water supply, and agricultural <br />economy appendices. Tne proposeQ feasibility <br />report is scheduled for ccmpletion at the end <br />of this fiscal year. <br /> <br />I <br /> <br />on the Yellow Jacket project, work is <br />going very well on that. That will be the next <br />project to get a report on after we complete <br />the Battlement Mesa project. <br /> <br />work is also progressinS]" abo'_lt on schedule <br />on the Upper Gunnison Project. <br /> <br />On the Basalt Project, your Board advanced <br />funds to us for work on this project last year <br />and the Basalt Water conservancy District con- <br />tributed $10,000 to us tilis year to continue <br />this work. <br /> <br />There are no new developments to report <br />on the Animas-La Plata, Dolores, Dallas Creek, <br />san Higuel, and ~I'est Divid" ~'rojscts. <br /> <br />"lork no,," progressing Oel the .;'rui tland l.!esa <br />project consists of sedimcnt,ation studies, new <br />farm unit layout si:uc:5.es, 2-r,d preparation of <br />the operation and mair.ten~mce ?ppendix. <br /> <br />Under our Advancr.: pj2nnil:g ~'lOrk for the <br />Fruitland l-lesa Projec':,;vc ,Fwe P'O,de good I <br />progress on tllis project. T;,c final drilling <br />for detailed plans ana specifications on the <br />Black Mesa tunnel is essentially completed. <br />Some drilling ,,,ork has been done on the Soap <br />park Reservoir, the principal ctorage unit for <br />this project. We have progresaed to the stage <br />where we have had some initial meetings for <br />
The URL can be used to link to this page
Your browser does not support the video tag.