My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01698
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01698
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:05:57 PM
Creation date
10/4/2006 7:01:06 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
12/14/1966
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />two-thirds of normal. At this rate we are guess- <br />ing that. we'll have a minimum of about S.3 <br />million acre-feet available when spring runoffs <br />start next year. <br /> <br />I <br /> <br />Now moving on to our general investigation <br />program and feasibility investigations, feasi- <br />bility designs and estimates have been completed <br />for all project features on the Battlement Mesa <br />project. Draft copies of reports have been re- <br />ceived from the Bureau of outdoor Recreation and <br />the Forest Service. With respect to the Bureau <br />of outdoor Recreation report, a meeting was <br />scheduled for December 6 to discuss the Bureau <br />of Reclamation report findings and recommenda- <br />tions. preliminary values have been received <br />from the Bureau of Sport Fisheries and Wildlife's <br />report and we expect to receive 'the report <br />shortly. preparation of the designs and esti- <br />mates and financial analysis appendices are <br />under way. All other appendices are complete <br />and the proposed feasibility report is scheduled <br />for completion in February 1967. <br /> <br />Plan formulation studies, water supply <br />studies, and agricultural economic studies are <br />continuing on the Bluestone project. A founda- <br />tion exploration program has been laid out for <br />the Parachute damsite and drilling will be under- <br />taken this winter. The proposed feasibility <br />report is scheduled for completion 'in mid F.Y. <br />1968. <br /> <br />On the Grand Mesa Project plan formulation <br />studies and water supply studies are in progress. <br />Foundation explorations at Electric Mountain <br />damsite were completed. <br /> <br />I <br /> <br />with regard to the aerial topographic maps <br />for the ElectiicMountain Service Canal, a meet- <br />ing was held with the contractor and agreements <br />were reached as to corrections the contractor <br />needed to accomplish to make the data complete <br />and acceptable under the contract. The contrac- <br />tor has submitted all data called for under the <br />contract but final checking has not been com- <br />pleted. A proposed feasibility report is <br />
The URL can be used to link to this page
Your browser does not support the video tag.