My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01698
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01698
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:05:57 PM
Creation date
10/4/2006 7:01:06 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
12/14/1966
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />of this coming year. Final completion of the <br />dam structure will probably be.made in about <br />January. After the concrete is placed, the <br />principal item is the grouting and some other <br />miscellaneous work. Work will continue through <br />the winter months in the underground powerplant, <br />excavation of the stilling basin area, and place- <br />ment of the steel penstocks in the tunnels lead- <br />ing to the powerplant. The prime contractor <br />should essentially complete the powerplant <br />structure by early spring, April or May. <br /> <br />Moving on to our participating projects, <br />on the silt Project the contractor has sub- <br />stantially completed the embankment for Rifle <br />Gap Dam. Clearing work is under way and final <br />closure was made at Rifle Gap Dam on November <br />19th. The contractor is making very good <br />progress on second stage work for the outlet <br />tunnel. The contractor is expected to concen- <br />trate on resloping the relocated highway cuts <br />and repairing sections of roadway damaged by <br />slides. The bituminous surfacing of the highway <br />will be performed next spring. <br /> <br />One of the other principal items for the <br />Silt project, the silt pumping Plant, final <br />testing of the pumping units on this plant were <br />started about ten days ago. Construction work <br />has been finished for silt pump Canal, Dry Elk <br />Valley Lateral, and the Grass Valley Canal <br />rehabilitation. The contractor for Davie Ditch <br />is expected to complete earthlining operations <br />early in the spring. <br /> <br />I <br /> <br />On the Bostwick Park Project, another one <br />of the participating projects and the most recent <br />one to have construction work started on it, <br />bids, as you know, have been let on the Silver <br />Jack Dam, the principal storage unit of the <br />project. The contractor made a start this fall, <br />did some stripping work, some clearing work, <br />channelization of Cimarron Creek and other work. <br />It is now shut down for the year. <br /> <br />As to the general water supply situation, <br />
The URL can be used to link to this page
Your browser does not support the video tag.