My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01683
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01683
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:05:48 PM
Creation date
10/4/2006 7:00:55 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/12/1967
Description
Agenda, Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~: .J <br /> <br />(t .:: . ~. <br /> <br />': <br /> <br />;-~ ~.' . <br /> <br />NR. STAPLETON:. <br /> <br />On the Narro'~s Unit, a division of the <br />Iussouri River Basin project, the commission- <br />er's proposed report to the Secretary of the <br />Interior is undergoing review. <br /> <br />On the Upper South Platte Unit, also a <br />unit of the Missouri River Basin project, cost <br />estimates were completed for access roads and <br />road relocations required for single-purpose <br />cost-allocation alternatives. <br /> <br />I <br /> <br />On March 2, Regional hydrologists met <br />,~ith two members of the Denver Board of Water <br />Commissioners to discuss operational criteria <br />for TWO Forks Reservoir, water yieids from <br />western sources, and storage rights for ~10 <br />Forks Reservoir. Hydrology studies related <br />to these aspects of the investigations were <br />continued after the March 2 meeting. <br /> <br />On the st. Vrain Unit, also a segment of <br />the Missouri River Basin project, the field <br />draft of the report is undergoing review in <br />the Regional Office. <br /> <br />On the Armel unit, another segment of <br />the Missouri River Basin project,' and formerly <br />known as the st. Francis Unit, meetings have <br />been held to determine local interest concern- <br />ing the potential development of the Armel <br />unit in Colorado. <br /> <br />I know I am on the program later today <br />to discuss the pryingpan-Arkansas project. <br />At that time I will present more detailed <br />information in connection with our activities <br />in the Arkansas River Basin. <br /> <br />I would be glad to answer any questions." <br /> <br />I <br /> <br />"Jim, ,~hat are the procedural steps in the <br />Narrows Unit and what's the tentative timetable <br />after the report is reviewed and theCommis- <br />sioner sends it to the Secretary( could you <br />go over.some of those steps of the procedure?" <br />
The URL can be used to link to this page
Your browser does not support the video tag.