My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01677
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01677
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:05:20 PM
Creation date
10/4/2006 7:00:27 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/26/1999
Description
CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />" <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />Ryan Gulch Reservoir Company - Ryan Gulch Dam Rehabilitation <br /> <br />Authorization: SB 99-173 <br />Water Source: Big Thompson River <br />Terms of Loan: $317,500@4.25%for30years <br /> <br />County: Larimer - S. of Loveland <br />Project Yield: 645 ac.ft. <br />Project Type: Dam Rehabilitation <br /> <br />This project is the rehabilitation of the Ryan Gulch Dam which includes the construction of <br />a new spillway, lining the upstream face of the dam with a clay liner, sleeving the existing 24-inch <br />outlet pipe, and constructing a new upstream controlled inlet works. Boyle Engineering, Inc. of <br />Denver has been contracted to complete the project design, which is scheduled for construction for <br />the fall of 1999. <br /> <br />Highland Ditch Company - Foothills Reservoir Dam Rehabilitation <br /> <br />Authorization: SB 98-1198 - Severence Tax <br />Water Source: St. Vrain River <br />Terms of Loan: $1,040,000 @4.0% for 30 years <br /> <br />County: Boulder - W ofLongmont <br />Project Yield: 450 ac.ft. <br />Project Type: Dam Rehabilitation <br /> <br />This project is the rehabilitation of Foothills Reservoir dam, located west of Longmont in <br />Boulder County. The dam has an inadequate spillway and severe seepage through the embankment <br />and has had a storage restriction placed on it by the State Engineer. The Highland Ditch Company <br />has contracted with Smith Geotechnical Engineering Consultants of Fort Collins to analyze design <br />alternatives and complete construction plans and specifications. Construction is scheduled to <br />commence in the fall of 1999. <br /> <br />Boulder & Lefthand Irrigation Company - Twin Lakes Outlet Improvements <br /> <br />Authorization: 1998 Small Project Loan Account <br />Water Source: Boulder Creek <br />Terms of Loan: $50,000@3.75%for 15 years <br /> <br />County: Boulder - NE of Boulder <br />Project Yield: 218 ac.ft. <br />Project Type: Dam Outlet Improvements <br /> <br />This project is the reconstruction of the Boulder & Lefthand Irrigation Company reservoir's <br />(Twin Lakes) outlet and inlet structures. Recent State Engineer Office inspections indicate that the <br />outlet conduit has rusted through and is functionally obsolete. Rocky Mountain Consultants of <br />Longmont are currently preparing the improvement design with construction scheduled for late <br />1999. <br />
The URL can be used to link to this page
Your browser does not support the video tag.