<br />Julesburg Irrigation District - Hannonv Ditch #1 Diversion Structure Rehabilitation <br /> <br />Authorization: Emerg. Infrastructure Repair Account County: Logan - SW of Crook <br />Water Source: South Platte River Project Yield: 40,000 ac.ft. <br />Terms of Loan: $590,000 @3.75% for 30 years Project Type: Diversion Rehabilitation <br /> <br />e <br /> <br />This project is the emergency rehabilitation of the Julesburg Irrigation District's Hannony <br />Ditch #1 diversion structure on the South Platte River 4 miles southwest of Crook. The structure <br />was damaged by the 1997 South Platte floods and is critical to the operation of the Company's <br />Julesburg Reservoir. Zoyiopoulos & Associates of Greeley prepared the design plans and the <br />construction contract was awarded to Concrete Specialties, Inc. of Sterling in early January 1999. <br />Construction is currently 60% complete. Due to the threat oflow spring runoff, the District decided <br />to complete 50% of the. diversion dam and 100% of the headgate structure, demobilize the <br />contractor, and complete the project in the fall. Project completion is therefore scheduled for <br />October 1999. <br /> <br />Fort Morgan. City of - NCWCD Southern Pipeline Extension <br /> <br />Authorization: SB94-029, SB98-1189, Svrnce Tax <br />Water Source: Colo.-Big ThompsonlWindy Gap <br />Terms of Loan: $5,500,000 @ 4% for 40 years <br />$8,000,000 @ 4% for 30 years <br /> <br />County: WeldIMorgan - W ofFt. Morgan <br />Project Yield: 6,877 ac.ft. <br />Project Type: Pipeline Construction <br /> <br />e <br /> <br />This project is an extension of the Northern Colorado Water Conservancy District's <br />Southern Pipeline Project. The pipeline extension will provide high quality western slope water to <br />the City of Fort Morgan for their municipal use. Montgomery Watson, Inc. of Denver completed <br />the project design, from the Hudson/Ft. Lupton extension at Platteville, to the Fort Morgan area, in <br />June. The construction contract was awarded to BRB Contractors, Inc. of Topeka, Kansas and <br />construction commenced September I, 1998. Construction is approximately 85% complete with <br />project completion scheduled for late 1999. <br /> <br />DeWeese-Dve Ditch and Reservoir Companv - DeWeese Dve Reservoir Dam Rehabilitation <br /> <br />Authorization: SB 98-1189 <br />Water Source: Grape River <br />Terms of Loan: $734,000 @ 4% for 30 years <br /> <br />County: Custer - SW of Canon City <br />Project Yield: 4,020 ac.ft. <br />Project Type: Dam Rehabilitation <br /> <br />This project consists of the replacement of the entire upper 12 feet of the DeWeese Dye <br />dam crest. The new crest section will include reinforcing bar anchors drilled and grouted into the <br />original dam and a new drainage/seepage control system. GEl Consultants, Inc. of Englewood, CO <br />completed project design and construction contract documents. The construction contract was <br />awarded to Blattner and Sons, Construction Co., Inc. of Avon, Minnesota July 19, 1999. _ <br />Construction is scheduled to commence in August with completion scheduled for November 1999. .., <br />