Laserfiche WebLink
<br />Water Right CFS. <br />Average water diverted per year <br /> <br />Acre-feet <br /> <br />7. Please list the names and addresses of any technical or legal consultants retained to represent the applicant or to conduct <br /> <br />investigations for the proposed project or study: N/A <br /> <br />NAME <br /> <br />ADDRESS and PHONE <br /> <br />8. List any feasibility study or scope of work that has been completed or is now in progress for the proposed project or study. (please <br />submit one copy with this application): <br />The originaZfrasibility is located at cdss@Jstate.co.us <br />9. What is the estimated cost of the project or study? Please include estimated Planning, Engineering, and Construction costs, if <br />known: <br /> <br />Estimated Planning/Study Costs: <br />Estimated Engineering Costs: <br />Estimated Construction Costs: <br /> <br />$ <br /> <br />Estimated Total Costs: <br /> <br />$2.500.000 <br />$ <br />$2.500.000 <br /> <br />10. <br /> <br />What amount are you requesting? <br /> <br />$2.500.000 <br /> <br />Where will the rest of the funding come from? <br /> <br />$ N/A <br />$ N/A <br /> <br />Part C. - Project Sponsor Financial Information <br />The CWCB Construction Fund is primarily a revolving loan fund. Non-reimbursable Investments are approved only when the project or <br />study is of Statewide interest and benefits a wide range of people. The following infonnation is requested to assist the CWCB in a <br />preliminary assessment of the applicant's [mancial capacity. It is also requested that the project sponsor submit with this application copies <br />of the two most recent annual reports, [mancial statements, corporate reports or other current documentation of [mancial condition and <br />operations. <br /> <br />List any existing liability or indebtedness that exceeds one thousand dollars. For example, bank loans, govennnent <br />agency loans, bond issues, accollilts payable, etc. Include names and addresses ofIenders, amollilts, due dates and <br />maturity dates. (You may attach a separate schedule if you wish): <br /> <br />Lender <br /> <br />Total <br />Amount <br /> <br />Annual Maturity <br /> <br />N ame/ Address <br /> <br />Pavment Date <br /> <br />N/A <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />